Laserfiche WebLink
q <br /> I'. <br /> ii <br /> IMPACT MITIGATION 14AON1TORING ACTION RI=SPONSUS TIMING <br /> AGENGY <br /> Possible loss of A 50-foot natural The Development Development Prior to <br /> riparian habitat. setback buffer shall Services division will Services Division recordation of i <br /> 6e established along review the Final Map and the the Final Map i <br /> each side cf the and CC&Rs before Department of Fish and at.the time <br /> i <br /> creek. recordation. and Game and the of building <br /> i' <br /> A 100-loot natural Building permit <br /> setback buffer shall Building and grading Department approval <br /> be established around permits will be checked i <br /> the pond.I against the Final Map. <br /> The above buffers <br /> shall be mapped on <br /> the Final IMap and <br /> Included in the <br /> CC&R's.iE <br /> i <br /> i <br /> Loss of Vernal The vernal Pools in The Development Development Prior to <br /> Pools and Wetlands. lots 7,%:'�13 and 16 Services division will Services Division recordation of <br /> and a 50(foot buffer review the Final Map and the the Final Map <br /> F <br /> around them shall be and CC&Rs before Department of Fish and at the time <br /> designated as"Open recordation, and Game and the -of building <br /> Spece"and protected. Building permit <br /> The buffer shall be Building and grading Department approval. <br /> mapped on the Final permits will be checked <br /> Map andel Included in against the Final Map. <br /> the CG&R's. <br /> �s <br /> �i <br /> A i <br /> i u <br /> k <br /> } <br /> I <br /> I <br /> I a <br /> I <br /> Initial Study �� (Rev: O1/91) <br /> 12 <br /> is <br />