Laserfiche WebLink
APPLICP�TION- MAJOR SUBDIVISION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ............... ......... ..... <br /> ".�'g� �.ggg ' <br /> .......... <br /> 'S <br /> Describe the current depth of the ground water and depth to potablewater: The latest San Joaquin County <br /> Water Conservation District maps reveal the standing water level at a depth of <br /> approximately 160 feet. This relates to E.. groundwater elevation of approx. -10 ft <br /> Describe any existing drainage courses or eroded areas on or near�Ie project site(e.g. rivers,creeks or drainage ditches): <br /> A drainage creek flows across the propert�f� from east to west. <br /> Describe any areas subject to flooding (including flood depths and flood panel map numbed: <br /> This proi)erl;y is subject to minimal floodjiUg dQsJ=,t,d b;Z FEMA a-, Zane C. <br /> (Panel No. 060299 0190 B) . <br /> ...................... <br /> .... ....... <br /> tid <br /> Describe the she's topography (e.g. land forms,slopes,etc.): <br /> The existing topography isrolling, slopin'g gently to- southwest, <br /> Describe agricultural land that will be lost as a result of the project(Vpe of crops,acres, quality of soil,etc.); <br /> Dry pasture. There have been previous unsuccessful attempts at orchard and <br /> vineyards, but they did not work out. <br /> Describe any wildlife habitat on-she and species that are of may be present Numerous large oak trees, an <br /> intermittent stream channel. No wild life' observed other than birds and rabbits, <br /> Describe any vegetation on-site by type and extent Large oak trees. Dry native grasses. <br /> -a-me- <br /> ............X. <br /> . ........ . <br /> ­*.. ......... <br /> .... .... ....... ............ <br /> ............ <br /> Describe air pollutants that may result from the project (e.g. construction related dust,vehicle trips per day,fire places,incinerators, <br /> ale): Dust and equipment fumes during construction. Fireplaces likely in new homes. <br /> Estimate 50+ vehicle trips per day at buildout. <br /> .......................I........... ....... <br /> ...... ....... <br /> .......... <br /> ... ....... <br /> ..... .......... . ....... .. . ...... <br /> ............. ....... ...... <br /> ................................. <br /> ................... .. .... <br /> Describe any items of historical or archaeological interest on-she(e.g';cemeteries or structures): None <br /> Describe any on-site or off-she sources of noise or vibration (e.g.frea.Nay noise, heavy equipment,etc.): None <br /> 3 <br /> Describe any on-site or off-she sources of light of glare (e.g. parking Tot lighting,or reflective materials used): None <br /> Describe any on-she or off-site source of odor(e.g.agricultural wasted): None <br /> Describe any displacement of people that will be caused by the project(e.g.numbers of people, housing units): None <br />