Laserfiche WebLink
' 5.3 Description of soil lithology as noted from test pit by appropriate professional using <br /> ' industry standard protocol. The soil in this area is classified as Rocklin Sandy Loam and <br /> San Joaquin Sandy Loam, as stated in the Soil Survey of San Joaquin County, as provided by <br /> the United States Department of Agriculture, Soil Conservation Service. <br /> ' 5.4 Discussion of soil lithology as related to future onsite septic uses: The soils <br /> classified as San Joaquin Sandy Loam in this area have permeability that is very slow. The soil classified <br /> as Rocklin San Loam in this area has a moderate permeability. The percolation rate was between 25 to 28 <br /> min/in.(See Appendix.) <br /> ' 6.0 PERCOLATION TEST INFORMATION SECTION <br /> 6.1 Site map showing the location, with concise and accurate dimensions of the percolation <br /> ' test holes on the parcel: See Appendix. <br /> 6.2 The minimum number of shallow and deep percolation tests were performed for each <br /> t parcel: Two shallow percolation test holes were prepared for this application. Two shallow <br /> percolation holes were previously tested June 2, 2011 under PA-10-279. (See Appendix.) The <br /> 2011 results are on two of the lots in this application. <br /> ' 6.3 Description of the date, time and protocol used to prepare the test hole, including depth <br /> and dimensions of hole, preparation of hole, and depth of water used to presoak(minimum <br /> ' 12 inches): The shallow test holes were excavated to a depth of 42 inches and 8 inches in diameter <br /> and backfilled with 2 inches of"pea gravel' in accordance with County Standards. The shallow <br /> holes were prepared by Mike Toy of Dillon and Murphy on June 27, 2018 at 7:30 a.m. On July 1, <br /> 2018 at 7:30 a.m. the 24 hours presoak period was started. The holes were filled with 12 inches <br /> of water over the gravel at this time. <br /> ' 6.4 Description of the date, time and condition of the test hole after the 24-hour soak period <br /> (hole still intact,hole dry,preparation of hole,and depth of water used to presoak(minimum <br /> 12 inches): On July 2, 2018 at 7:30 a.m. the two shallow test holes were dry. Six inches of water <br /> ' were added to the holes and the holes were deemed suitable to continue. The shallow test passed <br /> the minimum County requirements. <br /> ' 6.5 The test conformed to SJC Policy EH 02-02(correct depth,diameter,2" gravel,6" water <br /> refill,correct readings recorded). The percolation tests conformed to San Joaquin County Policy <br /> EHD 02-02. <br /> ' 6.6 Complete Percolation Test Form (including readings) was provided with REHS <br /> verification signature. The rate was correctly calculated using the last reading. See Appendix <br /> tfor Test Results Form. <br /> Shallow Test(s) <br /> ' TEST HOLE PERCOLATION RATE <br /> 1 (Parcel 1) 28 Min/In <br /> I ' 2 (Parcel 3) 25 Min/In <br /> *See Results in Appendix. <br /> 3 <br />