Laserfiche WebLink
(0 <br /> IV. CPKCLUSIONS AND RECOMMENDATIONS <br /> SSS§ 5.4. The soils underlying the proposed effluent disposal area for the new Gurudwara Sahib <br /> Tracy Sikh Temple show acceptable permeability that can be considered acceptable for the short- <br /> term. For long-term effluent acceptance rate, the permeability of the soils will no doubt slow based r <br /> on the numerous factors described in this report. These include historical evidence based on repairs/ <br /> replacements/additions, biomat formation, groundwater table influences and the unknown <br /> characteristics of the wastewater. <br /> From the soil chemistry test results, it.appears that there is significant denitrification potential from <br /> I the 59-inch depth to the 77-inch depth,where saturated soils conditions were encountered. The 59- i <br /> inch depth nitrate-nitrogen concentration was found to be 22 ppm, which decreased to 9 ppm in the <br /> short distance of 18 inches. Additionally, the TKN concentrations show a continual decrease <br /> throughout the soil profile from a very high 1698 mg/kg at the soil surface to 307 mg/kg at the 77- <br /> inch depth, indicating substantial decrease in nitrate loading potential. <br /> NLS§ 4 SSS§ 6.7. -Due to the high(shallow)water-table, an engineer d moun effluent disposal—, , <br /> system must be installed for this project. The exact dimensions and size f this stern is currently <br /> unknown, and it may be that changes may have to be made to parking areas and possible structure <br /> I , footprints. The sand basal area will create a"pre-treated"effluent before it enters the native soil. As <br /> referenced above, effluent that may nitrify may theoretically denitrify at the observed soil depths <br /> (59" -77")where denitrification appears to be occurring. <br /> SSS§ 6.8. The Average Daily Flow for Phase H is calculated to be 472 gals/day from the Sikh <br /> Temple and Kitchen. The Application Rate at the native soil-efflue interface is presently 0.545 <br /> gals/ft'/day based upon the observed infiltration rate. With a preliminary disposal area as depicted on <br /> the Site Plans of approximately 52 ft N-S x 50 ft E-W =2,60 - 2 soil-effluent interface should <br /> accept the anticipated effluent flow readily. Even with a pgfierm Ac tance Rate (LTAR) of 0.2 <br />! gals/ft2/day still gives an ADF of: 2,600 ft' x 0.2 gals11 2 520 gpd. <br /> NLS§ 4.1. The nitrate loading potential for Phase H of the projec 'n ' ate lie per olating effluent <br /> may have a resultant nitrate-nitrogen concentration of 13.7 ppm, rhi exceeds the aximum <br /> Contaminant Level (MCL). As referenced, however, the percolati ' effluent s Id produce a <br /> dilution effect to this nitrate concentration. It is important to recogn' hen adding one <br /> concentration of a solute (i.e.,NO3-N concentration determined in the effluent recharge) to another <br /> concentration of a solute(i.e., NO3-N concentration determined in the underlying water table),where <br /> both solutes are in ppm, the result is not cumulative or the sum of the two solutes. Parts per million <br /> is amass ratio (mg per106 mg). For example, the Nr(the resultant average concentration of nitrate- .'r.:. <br /> nitrogen in effluent recharge in pprn of NO3-N), was determined to be 13.7 ppm by the Hantzsche- <br /> Finncmore Equation. This equals 13.7 milligrams of nitrate in 106 milligrams of water(one liter). If <br /> this 13.7 ppm concentration is added to the same volume of water(1 x 106 milligrams) of the <br /> concentration determined from the underlying water table where the sample was taken from,which <br /> I was 21.8 ppm NO3-N (97 ppm NO3), then the resultant concentration is now: 13.7 milligrams per n <br /> liter+ 21.8 milligrams per liter= 35.5 milligrams in 2 x 106 milligrams (2 liters, or parts per 2 C , <br /> k <br /> million) of water. r' <br /> E <br /> 16 <br /> I <br /> Chesney Consulting <br />