My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7675
>
3500 - Local Oversight Program
>
PR0544802
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:47 AM
Creation date
9/4/2019 11:28:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544802
PE
3528
FACILITY_ID
FA0005153
FACILITY_NAME
FAYETTE MANUFACTURING CORP
STREET_NUMBER
7675
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014012
CURRENT_STATUS
02
SITE_LOCATION
7675 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> WELL CONSTRUCTION DETAIL <br /> Fayette Manufacturing Corporation <br /> 7675 W. Eleventh Street,Tracy, CA <br /> Page 1 of 1 <br /> Well <br /> Casing <br /> Size <br /> Total Well (inside Screen/ <br /> General Installation Surface Depth diameter Well Casing Completion Screen Well Contaminant <br /> Well# Location Well Type Date finish (feet bgs) in inches) Material Type Interval Status Screen Interval ` <br /> MW-1 On-Site GWM 07/18/95 asphalt 22 -- 2 Sch 40 PVC_ 0.010" 5-22 ND P ss.Grput <br /> MW-2 On-Site GWM 07/18/95 concrete 27 ? 2 Sch 40 PVC 0.010" 5-25 Benzene, MTBEOverdri I �lh -J <br /> MW-3 On-Site GWM 07/18/95 asphalt 27 2(, 2 SCh 40 PVC 0.010" 5-25 Benzene II <br /> MW4 On-Site GWM 03/09/99 asphalt 26 2$ 2 - Sch 40 PVC 0.020" 6-26 ND rout 8 " <br /> MW5 On-Site GWM 03/09/99 asphalt 26 - 2 Sch 40 PVC 0.020" 6-26 ND rout 8 7 <br /> MW6 On-Site GWM 03/09/99 asphalt 26 2 Sch 40 PVC 0.020" 6-26 ND rout <br /> MW7 On-Site GWM 01/10/05 asphalt 20 2 Sch 40 PVC 0.010" 10-20 ND rout 8 <br /> MW8 On-Site GWM 01/17/05 asphalt 20 2 Sch 40 PVC 0.010" 10-20 MTBE ill <br /> MW9 On-Site GWM 08/31/09 asphalt 25 2? 2 Sch 40 PVC 0.010" 5-25 ND out NAS1 On-Site AS 09/02/09 asphalt 25 26. 2 Sch 80 PVC 0.020" 20-25 MTBE ri I vAS2 On-Site AS 09/02/09 asphalt 25 043 2 Sch 80 PVC 0.020" 20-25 TPH, Benzene, MTBEril p ` <br /> TPH, <br /> Benzene,Ethyl benzene, <br /> DP1 On-Site SVE 09/01/09 asphalt 25 ,?L 4 Sch 40 PVC" 0.010" 5-25 Xylenes, MTBE Overdrill <br /> Benzene,Xylenes, p Y <br /> DP2 On-Site SVE 09/01/09 asphalt 25 z �� 4 Sch 40 PVC 0.010" 5-25 MTBE Overdrill <br /> TPH, <br /> / Benzene,Ethylbenzene, <br /> DP3 On-Site SVE 09/01/09 asphalt 25 4 Sch 40 PVC 0.010" 5-25 Xylenes, MTBE Overdrill <br /> Notes <br /> GWM= / <br /> SV=Soil Vapor probe <br /> SVE=Soil Vapor Extraction well <br /> AS=Air Sparge well <br /> Press. Grout=pressure grouting with overdrilling the top 5 ft bgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.