Laserfiche WebLink
SJCAPCD <br /> MITIGATION MEASURES <br /> Page 2 <br /> 3) Use of petroleum-based dust palliative shall meet <br /> the road oil requirements of the District' s Rule <br /> 409. 5, Cutback Asphalt Paving Materials. <br /> 4) Streets adjacent to the project site should be <br /> swept as needed to remove silt which may have <br /> accumulated from construction activities. <br /> D. At all times, ozone precursor emissions should be <br /> controlled by the following methods: <br /> 1) All internal combustion engine driven equipment <br /> should be properly maintained and well tuned <br /> according to manufacturer's specifications. <br /> 2) During the smog season (May through October) , the <br /> construction period should be lengthened so as to I! <br /> minimize the number of vehicles and equipment <br /> operating at the same time. <br /> I <br /> I <br />