Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202 <br /> ' Telephone (209)468-3420 Fax (209)464-0138 <br /> C;W-D <br /> November 17, 2011 <br /> To: San Joaquin County Community Development Department y <br /> Attention: Mo Hatef <br /> From: Ted Tasiopoulos; (209) 953-7698 <br /> Senior Registered Environmental Health Specialis <br /> RE: PA-1100202 (MS), S00008953 <br /> 27370 East Copperopolis Road, Farmington <br /> The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. A qualified environmental professional shall prepare a surface and subsurface contamination <br /> report, identifying any potential source of surface or subsurface contamination caused by past <br /> or current land uses. The report shall include evaluation of non-point source of hazardous <br /> materials, including agricultural chemical residues, as well as potential point sources, such as <br /> fuel storage tanks, septic systems, or chemical storage areas. The report shall be submitted to <br /> the Environmental Health Department at time of submittal of a tentative map (San Joaquin <br /> County Development Title, Section 9-905.12). <br /> A review fee of$250 shall be paid at the time of submittal to the Environmental Health <br /> Department. <br /> NOTE: <br /> The Environmental Health Department has received a report dated October 2011, and it has <br /> been approved. <br /> B. A soil suitability study shall be submitted to the Environmental Health Department indicating <br /> that the area is suitable for septic system usage. The study must be approved by the <br /> Environmental Health Department prior to the recordation of Certificate of Compliance. (San <br /> Joaquin County Development Title, Section 9-1105.2 (d)). A review fee of$250 must be paid at <br /> time of submittal to the Environmental Health Department. <br /> The sewage disposal system shall comply with the on site sewage standards of San Joaquin <br /> County prior to approval. A percolation test that meets absorption rates of the manual of septic <br /> tank practice or E.P.A. Design Manual for onsite wastewater treatment and disposal system is <br /> required for each parcel. A permit fee of$125 per percolation hole is required. <br /> C. Construction of an individual sewage disposal system(s) under permit and inspection by the <br /> Environmental Health Department is required at the time of development based on the Soil <br /> Suitability/ Nitrate Loading Study findings (San Joaquin County Development Title, Section 9- <br /> 1110.3 & 9-1110.4). <br />