Laserfiche WebLink
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY............................................................................................1 <br /> Introduction ................................................................................................................1 <br /> ProposedDevelopment.............................................................................................1 <br /> SiteDescription..........................................................................................................1 <br /> PastUses of the Site..................................................................................................2 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System ..................................................................................2 <br /> ProposedSeptic System................................................................................2 <br /> On-Site Septic Permit History........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................2 <br /> Septic Permit History in the Vicinity...............................................................3 <br /> Expected On-Site Maximum Septic Tank Usage...........................................3 <br /> Ground Water Information.........................................................................................3 <br /> Depthand Gradient........................................................................................3 <br /> Potential Ground Water Contamination Issues..............................................3 <br /> On-Site Wells.................................................................................................4 <br /> WaterSample................................................................................................4 <br /> SoilProfile and Geologic Information......................................................................5 <br /> SoilBorings....................................................................................................7 <br /> Discussion of Soil Lithology............................................................................7 <br /> PercolationTest.........................................................................................................7 <br /> Preparation and Presaturation of Percolation Test Hole................................7 <br /> Percolation Test Procedure............................................................................8 <br /> Percolation Test Results................................................................................8 <br /> Discussion of Percolation Test Results..........................................................9 <br /> Discussion of Septic System Sizing...............................................................9 <br /> CONCLUSIONS AND RECOMMENDATIONS .............................................................10 <br /> LIMITATIONS................................................................................................................11 <br /> SELECTED REFERENCES ..........................................................................................12 <br /> LOGE 1323 <br />