Laserfiche WebLink
Fa WORK REQUEST FORM <br /> i ; <br /> Date of Request: 022599 Requested Completion Date: 031199 <br /> Proj Name: Glover Property Proj No: 178 1.0001 <br /> Site Address: 7675 Eleventh St. Tracy Ca. Task: <br /> Project Manager:_ Jeanne Homsey Field Tech: Alex Flores <br /> Client Contact: Dr. Glover Phone No: 209-835-9200 <br /> Regulatory Contact: Ron Rowe Phone No: 209-468-3420 <br /> Approval: Completion Date: OZ 11 9 <br /> i' <br /> Notify fent and tegulator 48 hrs. 12rior to site work. <br /> Contact on site, Rudy(Foreman) at 832-8400 <br /> Monitor wells in order MW-13 & 2. f 6 5 <br /> f M r DT TB all wells <br /> Develop and sample new monitoring. wells MW-4,5 & 6. _ <br /> Purge and sample all wells in the same order. <br /> Sample all wells for BTEX/TPHg. with MTBE in urechilled VOC vials. <br /> Sample new well MW-4-6 for fuel oxygenatesby EPA 8260. <br /> Noe in C-O-C "detection limits 50 VVb for gas, and 0.5 ppb for BTEX. Please <br /> provide copies of chromatograms with chromatograms standards" <br /> Sa=les to Sequoia. Arra e for sam le ick u . <br /> Survey new wells, tie into existing wells. e5_� OT <br /> Take 7 drums for dev /purge water containment <br /> Contain purge water. MW-1 ND last round of sampling,12/98 reuse drum. _ <br /> Contai MW-2&3 se retel from MW-1. Take 2 drums. <br /> Wells are two inch water 0 8' total de th a 24' all are high flow, <br /> Drum lnven o <br /> Prepare purchasp, order form. Af <br /> AFLORESIF-WORK.doc <br />