Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION. <br /> PROJECT NAME:Cj e -Pu PROJECT NUMBER: 1 ISIL 1 ,00ee f WELL NO. (,I W <br /> PROJECT MANAGER:_ �_ _TYPE OF WELL. Monitoring Extraction Other <br /> RECORDED BY: SAMPLED BY: DATE: O-3i1 j <br /> WELL PURGiNG,<INFORIMATION> <br /> = PURGE VOLUME PURGE METHOD <br /> Well C sing Diameter <br /> -inch flinch Other ailer - Type <br /> PumP Type(;bvk•tr�k i.ugc� <br /> Well Total Depthj2 <br /> 7. 0J feet below Tap of Casing, D Other - Specify } <br /> Depth to Water '�4 Feet below lop of Casing,WL Hydrocafbon Odors: <br /> Water Column Length i feet ✓Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No.Volum(es = Calculated Purge Volume) <br /> 41 D 1, X 6, 1 X _ ` j Calculated Purge Volume = `_� gallons <br /> (WCL) (Multiplier) (No.Volumes) Actual Purge Volume = !`�, � 'allons <br /> f :> Mutti iier:`.Casf :;DiameteF<>.inches).-=>:Gallotisl.Ghearf6ot) Z�:C,�'�.>'4=Q66::«6 1..5::'.B., �:6= <br /> Groundwater Parameter Measurement: Meter Type j C11Calibrated:?Yes—No <br /> - TIME ELAPSED FLOWRATE OTW pH EC TEMP TURBlDiTY REDOX COMMENTS <br /> TIME (GPM) (ft) anhaslcm <" (NT" mV _ <br /> deg F L) .ti 1G7' wti <br /> 3 1230 6 7, 2 l0 0 -zo zr • <br /> •r-i10 <br /> 113 3 S -71'2_ 1 leqO a <br /> L:LA,, N, ��' s• CQ y <br /> f <br /> �s <br /> ITAKASSOCIATES INC. <br /> ENWRCNMENTAL,GFOTECHNfCAL AND MATERIALS PRoFESSIONAis <br /> I. <br />