My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011879
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7675
>
3500 - Local Oversight Program
>
PR0544802
>
ARCHIVED REPORTS XR0011879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:08 AM
Creation date
9/4/2019 11:42:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011879
RECORD_ID
PR0544802
PE
3528
FACILITY_ID
FA0005153
FACILITY_NAME
FAYETTE MANUFACTURING CORP
STREET_NUMBER
7675
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014012
CURRENT_STATUS
02
SITE_LOCATION
7675 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AILs <br /> C._! <br /> /.._. -.� A S S D C I A T E S I N C <br /> s}5 <br /> 1% <br /> ♦ Criterion 5: <br /> subsurface contaminants to acceptable regulatory <br /> This,alternative should effectively remediate <br /> levels within 18 months of implementation- <br /> Criterion 6: <br /> =j <br /> The long term effectiveness for soil remediation would be good depending upon the degree o <br /> contaminant removal. Groundwater would be monitored periodically until soil and <br /> groundwater is remediated to ensure that petroleum hydrocarbons are biodegrading. <br /> ♦ Criterion 7: <br /> >, This alternative has some minor implementability problems due to the necessity of a pilot test <br /> and the time involved in obtaining permits from the APCD for the vapor extraction system, <br /> permitting could take as much as 180 days depending upon APCD work load, but is typically <br /> completed in 60 to 90 days. <br /> <� ♦ Criterion 8: <br /> Impact to the businesses during installation and other site activities will be moderate. This <br /> method has been shown to be effective in similar soil types and regulatory acceptance is <br /> expected. <br /> 9.0 RECOMMENDATIONS <br /> Based on the soil and groundwater data compiled and included in this technical report ATC <br /> Associates recommends passive remediation of the petroleum hydrocarbons beneath the site, <br /> €`==� ATC Associates recommends performing quarterly monitoring events and analyzing groundwater <br /> samples for geophysical parameters in addition to the existing monitoring parameters. The <br /> geophysical parameters should include dissolved oxygen, carbon dioxide, sulfate, alkalinity, <br /> �. <br /> ferrous iron, nitrate, and Eh. <br /> - Upon regulatory concurrence of the preferred remedial action method, ATC Associates will begin <br /> analyzing groundwater samples collected during quarterly monitoring events £or geophysica <br /> parameters. <br /> z, <br /> Ieta <br /> w:195122keportslparcap.doc 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.