Laserfiche WebLink
3 <br /> WORK REQUEST FO <br /> RM <br /> Date of Request: 060697 <br /> Requested Completion Date: 062497 <br /> Proj Name: Glover Pro er <br /> Proj No:-E5-j22 Phase: O1 <br /> Site Address: 7675 Eleventh St. Trac Ca. Activity: 02 <br /> Project Manager: Jeanne Homse <br /> Field Tech: Alex Flores <br /> Client Contact: Dr. Glover <br /> Phone No: 209-835-9200 <br /> Regulatory Contact: Ron Rowe <br /> Phone No: 209-468-3420 <br /> Approval: c�`� Completion Date: <br /> ;4 1=- <br /> Noti I Client and Re ulator 48 hrs, rior to site <br /> Contact on site Rud - Foreman at 832-8400 Fork. <br /> - Monitor DTW/DTB all wells. <br /> Monitor wells in order MW-1 3&2 <br /> Pure and Sam le all wells in the same order. <br /> Sam le for BTEX/TPH with MTBE in rechilled VOC vials. <br /> Note in C-O-C "detection-1 imits 50 b for as and 0�Stqnd�ard�s�� <br /> 5 b <br /> rovide co ies of chromato rams with chromato ramsPlease <br /> Sam 1e for Intrinsic Bioremediation arameters as follow: DO COa <br /> Alkalinit NOs SO4 <br /> and Ferrous Iron. Field filter ferrous iron with .45 micron f <br /> Sam Ae in the field for Redox EC H Reteerature. ter. <br /> Sam Ies to Secot Arran efor sam Ie container deliver and ick <br /> Deliver bioremediation sam Ies to the lab the same da collected, up. <br /> Contain ur water. MW-1 ND last round of sam lin 03/97 reuse drum. <br /> Contain MW 03/97 se areteI from MW-1. Take 2 drums, <br /> Wells are two inch water 7' total de th 24' all are hi h flow. <br /> Drum inventor . <br /> AFLORESIp-Wogs{doc <br />