My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012952 SSCRPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2600 - Land Use Program
>
UP-7-95
>
SU0012952 SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2020 10:03:22 AM
Creation date
9/4/2019 11:45:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SU0012952
PE
2626
FACILITY_NAME
UP-7-95
STREET_NUMBER
2705
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204-
APN
12308029
ENTERED_DATE
1/16/2020 12:00:00 AM
SITE_LOCATION
2705 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2103\SSC RPT.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Injection <br /> ORC SLURRY INJECTION <br /> Dissolved Hydrocarbon Level(ppm) 67 Solids Content(%) 40% <br /> (For gasoline sites use BTEX measurements) Hole Spacing (ft) 10 <br /> Treatment Zone Width (ft) 75 Number of Holes in Grid 31 <br /> Treatment Zone Length (ft) 41 ORC per Hole(lbs) 626.3 <br /> Thickness of Saturated Treatment Zone(ft) 15 Water needed per Hole for Slurry (gal) 112.6 <br /> Porosity 0.42 <br /> (sand= 0.3, silt=0.35, clay=0.4) APPLICATION COMMENTS <br /> Total Treatment Zone Volume(cu. ft) 46,125 ' ORC per hole is above lower limit of <br /> Dissolved Prase Hydrocarbon Mass (lbs) 80.9 1 pound per linear foot. ' <br /> Additional Demand Factor 8 <br /> (REGENFSIS recommends a factor of about 8) <br /> Loaded Hydrocarbon Mass (lbs) 647 2 <br /> Oxygen Required (Ibs) 1941.6 <br /> ORC Required (lbs) 19,416.0 <br /> ORC Unit Cost $ 10.00 <br /> Total Cost of ORC $ 194,160.00 <br /> FOR SOLUTE TRANSPORT MODEL ENTER VALUES BELOW <br /> GW Velocity (ft 1 day) 0 73 <br /> Compliance Pt. (ft) 50 <br /> Ratio of 02 provided : 02 required (percent) 75% <br /> HC Level at compliance point <br /> after selected ratio of oxygen in ppm 12,223 <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.