Laserfiche WebLink
Y <br /> WORK REQUEST FORM <br /> Date of Request: 112796 - , Requested Completion Date: 121696 <br /> Proj Name: Glover Property _Proj No: 95-122 Phase: 01 <br /> Site Address: 7675 Eleventh St. Tracy Ca. Activity: 02 <br /> Project Manager: William Madison Field Tech: Alex Florey_ <br /> Client Contact: Dr. Glover Phone No: 209-835-9200 <br /> Regulatory Contact: Ron Rowe Phone No: 209-468-3420 <br /> Approval: a44' Completion Date: l X1 (0 q(=, <br /> Notify Client and Regulator 48 hrs. prior to site work. <br /> Contact on site, Rudy-(Foreman) at 832-8400 <br /> Monitor DTW/DTB all wells. <br /> Monitor wells in order MW-1,3&2 <br /> Purge and sample all wells in the same order. <br /> Sample for BTEXITPHF- with MTBE in prechilled VOC vials. <br /> Note in C-O-C "detection limits 50 ppb for gas, and 0.5 ppb for BTEX. Please <br /> provide copies of chromatograms with _chromatograms standards." Also, "if <br /> MTBE detected by EPA 8020, call William Madison, confirmation by EPA_8260 <br /> may be conducted". <br /> Sample for Intrinsic Bioremediation parameters as follow: DO, CO2, NOs, SOa. <br /> Alkalinity., and Ferrous Iron. <br /> Sample in the field for Redox, Ec, pH and temperature. <br /> Samples to Geoanalytical. Arrange for sample container_delivery and pick up. <br /> Deliver bioremediation samples to the lab the same day collected. <br /> Contain purge water. MW-1 ND last round of sampling, reuse drum._ <br /> Contain MW-2&3 senaretely from MW=I Take 2 drums.___ <br /> Wells are two inch, water Cad 7', total depth 0 24', all are high flow. _.. <br /> AFLOREST-WORK.3oc <br />