Laserfiche WebLink
.r. WORK REQUEST FORM <br /> Date of Request: 121196 Requested Completion Date: `121396 <br /> Proj Name: Glover Property Proj No: 95-122 Sub Job: 01 <br /> Site Address: 7675 Eleventh St. Tracy Ca. Task: 04 and 03 <br /> Project Manager: William Madison Field Tech: Alex Flores <br /> Client Contact: Dr. Glover Phone No: 209-835-9200 <br /> Regulatory Contact: Ron Rowe Phone No: 209-468-342 <br /> Approval: q&II <br /> VDate: s12 -3I— <br /> 95-122-1-4: Albi u. Dtru s �v rt acc cp at—l��wticur� P �;aop. <br /> Take 4 soil drums to Forward, use 2 trips if need to. Do not bother with the <br /> grout drum. <br /> Attached are the manifests. Please sign in the "Transporter" section___(m_i_ddle of <br /> the manifest). You will need one manifest for each!rip. <br /> I will call Rud on-site and I will schedule with Forward for Friday 12113196. <br /> You will probably need Rudy to get a forklift to lift the soil drums into the truck. <br /> Contact on site, Rudy-(Foreman) at 832-8400 <br /> 95122-1-3: Fs fr, _5—xo� To�w <br /> Replace wellboxes for MW-1 and MW-3 groundwater monitoring_wells. <br /> Rent an electric jackhammer and bring the generator to run the jackhammer. <br /> Bring or get 4 to 6 bags of concrete mix and one bag of cement mix. <br /> Die out the wellboxes and the SKIRTS and the grout and concrete. Dig a hole <br /> down to 12 inches and 12 inches in diameter. We need to make sure we aet <br /> enou h concrete below the bottom and around the outside of the new wellboxes <br /> in order to give, adequate strength for forklifts to roll over the_boxes. <br /> If you can't get the skirts out, please call me. <br /> Put CONCRETE below and around the new wellboxes. <br /> Install the new wellboxes (6" by 7" deep) and put NEAT CEMENT inside the <br /> new wellbox. Put the top of the new well boxes ONE INCH above grade and <br /> AFLOREST-WORK.doc <br />