Laserfiche WebLink
March 4, 2004 <br /> NOA Project Number: E0417A <br /> Page 2 <br /> year. <br /> • Sixty(60) golf carts are washed each day requiring five (5) gallons per <br /> cart. <br /> The remaining water use is associated with waste water generated by <br /> typical clubhouse activities. <br /> • The floor space of the new club house is about 00% increase in size of <br /> the existing building; therefore, an increase of 30% of waste water flow <br /> should be anticipated. Old.building: 27,000 sf, new building less cart barn <br /> is 35,000 sf.: 35,000 SF 127,000 SF = 1.3, 1.3 x 3,679 gpd=4,783 gpd <br /> .(4,800). <br /> Please refer to the attached tables and figures for the calculation of waste water uses associated <br /> with the existing club house building. If any of the assumptions are incorrect,please let me <br /> know as soon as possible. <br /> Our professional services were performed, our findings obtained, and our conclusions proposed <br /> in accordance with generally accepted engineering principles and practices. This warranty is in <br />` lieu of all other warranties either expressed or implied. Test findings and statements of <br /> professional opinion do not constitute a guarantee or warranty, expressed or implied. <br /> Best Regards, <br /> NEIL O. ANDERSON &ASSOC., INC. -0 GEO<O <br /> �N <br /> to QNo. 2151 y 'A <br /> David Welch, M.Sc., Senior Geologist CEMFo • <br /> CEG-2151, CHG-653 ® ANG opts G �Q <br /> Environmental Department Manager <br /> O <br /> �TFOF CP�-�� <br /> att: Table 1 <br /> Table 2 <br /> Figure 1 <br />