Laserfiche WebLink
E <br /> S Sufficient <br /> � I i= insuffidient <br /> fllj S j 6.0 PERCOLATION TEST INFORMATION SECTION <br /> k ® ❑ <br /> with concise and accurate dimensions of the percolation test holes on the parcel. <br /> 6.1 Site map showing the location, <br />+ 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br /> ® ❑ a 6.3 Description of the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). <br /> ® ❑ 6.4 Description of the date,time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole,etc.) <br /> ® ❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth,diameter, 2"gravel,6"water refill, correct readings <br /> recorded), <br /> ® o (including <br /> reading dings)was provided with REHS verification signature. The rate <br /> El 6.6 Complete Percolation Test F <br /> was correctly calculated using the <br /> 6.7 Discussion of any potential problems predicted and/or the need for an engineered or afeldstneeded ive tlat the <br /> site. <br /> ® ❑ 6,g Discussion of percolation rates in relation to the type,size and location of future leach field <br /> 7,0 CONCLUSION SECTION <br /> 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Lisa Medina Sr. R.E.H.S. <br /> Reviewed Date: .3/31/05 <br /> C <br /> C <br /> a <br /> Soil Suitability Checklist <br /> Page 2 of 3 <br /> EHD 26-02-003 <br /> Surface&Sub Checklist <br /> Page 1 o12 ' <br /> EHD 26-02-002 <br />