Laserfiche WebLink
-_CIVAT <br /> A S S O C I A T E S I N C <br /> upgradient well, were used as background levels and were incorporated in the model's <br /> parameters. <br /> One BIOSCREEN model input parameter not collected at the site is methane (CH4). ATC <br /> applied typical CH4 values collected from 28 Air Force Center for Environmental Excellence <br /> (AFCEE) sites. These data were presented in BIOSCREEN's User's Manual, which accompanies <br /> the model. <br /> BIOSCREEN Modeling Summary <br /> • BIOSCREEN was used to try to reproduce the movement of the benzene plume from <br /> 1986 (when the release was stopped) to fourth quarter 1997, representative of site <br /> conditions. The soluble mass in the soil was estimated by integrating the benzene soil <br /> concentration map included as Figure 3. Approximately 13.7-Kg of benzene were <br /> estimated to be present at the site based on GC/MS analysis of soil samples collected from <br /> both the vadose and saturated zones. This value represented a half-life of 500 years with <br /> the instantaneous reaction model (the first value shown in the source half-life box in <br /> Figure 5), a relatively long half-life, so the 14-Kg estimated utilizing 1996 through 2002 <br /> data was assumed to be representative of 1986 conditions. <br /> `' • Based on prior observation and calculations (see ATC's Additional Site Evaluation and <br /> Request for No Further Action for Former Fayette Manufacturing Facility, Tracy, <br /> California, dated June 27, 2000) the first-order reaction model was used as the primary <br /> model in an attempt to reproduce the plume length (— 130 ft). <br /> • Using the instantaneous reaction model's array concentration output values (which exhibit <br /> the remaining soluble mass in the source), the 1986 source mass was estimated. Different <br /> source mass values were inputed into the model with a simulation time of eleven years, <br /> until a best-fit value matched the calculated 1997 mass of 13.68-Kg. The instantaneous <br /> model predicted a 1986 soluble source mass 13.9-Kg would result in a 1997 mass of 13.7- <br /> Kg of benzene. This reflects a very good match to 13.68-Kg value, estimated utilizing the <br /> benzene soil concentration contour map (Figure 3). <br /> • On account that a decaying source was used, the source concentrations on <br /> BIOSCREEN's input screen (representing concentrations in 1986) were adjusted so the <br /> closest monitored concentrations on the centerline output screen (representing <br /> concentrations found in MW2 and MW3 in 1997) reflected approximately 1.3 mg/L and <br /> 0.17 mg/L respectively. Because the source decay term is different for the first order <br /> decay and instantaneous reaction models, this simulation focused on matching the first <br /> order reaction model. The final result was a source concentration of 13 mg/L in the center <br /> of the source zone (note on the centerline output the closest monitored concentrations are <br /> 1.425 mg/L and 0.161 mg/L, Figure 6). <br /> w:\17861\reporfs\modeling.doc 6 <br />