Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request: 060202 Requested Completion Date: 060502 <br /> Proj Name: Glover Property Proj No: 54.17861.0001 <br /> Site Address: 7675 Eleventh St. Tracy Ca. Task: <br /> Project Manager:_ Jeanne Homsey Field Tech: Alex Flores <br /> Client Contact: Dr. Glover Phone No: 209-835-9200 <br /> Regulatory Contact: Rebecca Setliff Phone No: 209-468-3440 <br /> Approval: Completion Date:— ncan sn) <br /> Notify Client and Regulator 48 hrs. prior to site work. <br /> Contact on site, Rudy-(Foreman) at 832-8400 Pf� <br /> Monitor DTW/DTB all wells in order. <br /> Monitor wells in order MW-1 6 5 4 3 and 2 <br /> Monitor DTW/DTB all wells. <br /> Purge and sample MW-1-6. <br /> Purge and sample all wells in the same order. <br /> Sample all wells for BTEX/TPHg with MTBE in prechilled VOC vials. <br /> Note in C-O-C "detection limits 50 ppb for gas, and 0.5 ppb for BTEX. Please <br /> provide copies of chromatograms with chromatograms standards" . If MTBE is <br /> positive by EPA 8020 confirm by running fuel oxygenates by EPA 8260. <br /> Samples to Argon Labs. <br /> Contain purge water. MW-1, 4, 5 and 6 ND last round of sampling (06/01) reuse <br /> drums. Take one drum. <br /> Contain MW-2 & 3 separately from MW-1, 4. 5 & 6. <br /> Wells are two-inch, water Ca. 7-8', total depth a 24', all are high flow. <br /> Drum Inventory. <br /> Prepare purchase order form. <br /> AFLOREST-WORK.doc <br />