Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request: 061101 Requested Completion Date: 061401 <br /> Proj Name: Glover Property Proj No: 54.17861.0001 <br /> Site Address: 7675 Eleventh St. Tracy Ca. Task: <br /> Project Manager: Jeanne Homsey Field Tech: Alex Flores <br /> Client Contact: Dr. Glover Phone No: 209-835-9200 <br /> Regulatory Contact: Margaret Lagorio Phone No: 209-468-3420 <br /> Approval: Completion Date: 0(o 1401 Al� <br /> Notify Client and Regulator 48 hrs. prior to site work. <br /> Contact on site, Rudy-(Foreman) at 832-8400 <br /> Monitor DTW/DTB all wells in order. <br /> Monitor wells in order MW-1 6 5 4 3 and 2. <br /> Monitor DTW/DTB all wells. <br /> Purge and sample MW-1-6. <br /> Purge and sample all wells in the same order. <br /> Sample all wells for BTEX/TPHg with MTBE <br /> Note in C-O-C "detection limits 50 ppb for gas, and 0.5 ppb for BTEX.44ease- <br /> eltromat <br /> " . If MTBE is <br /> positive by EPA 8020 confirm by running fuel oxygenates by EPA 8260. <br /> Samples to Argon Labs. <br /> Contain purge water. MW-1, 4, 5 and 6 ND last round of sampling(02/01) reuse <br /> drums. Take one drum. <br /> Contain MW-2, 3 & 4 separately from MW-1, 5 & 6. Take 2 drums. <br /> Wells are two-inch, water Cad 8', total depth 0 24', all are high flow. <br /> Drum Inventory. <br /> Prepare purchase order form. A v� <br /> �°'' AFLOREST-WORK.doc <br />