Laserfiche WebLink
yr ELL MONITORING DATA Sh--,ET <br /> Project 4: Client: <br /> �� �0 W hT �n✓ib��1t �� /YI�u,��.� <br /> Sampler: o StartDate: (ehlaZ <br /> Well I.D.: Well Diameter: Q 3 4 6 8 <br /> Total Well Depth: 2 Depth to Water: <br /> Before: After: Before: 7. <br /> After: 7, y <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: v Grade D.O. Meter (if req'd): YSI HACH <br /> Purge Method: Sampling Method: Bailer <br /> Bailer WatersDisposable a_ <br /> Disposable Bailer Peristaltic Extraction Port <br /> rd-dle g Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other: <br /> Well Diameter Multiplier Well Diameter Multi tier <br /> 1" 6 a" 0.65 <br /> c� oC (Gals.)X � = LO• Gals. 2" 0,1 0.16 6" I.47 <br /> 1 Case Volume Specified Volumes Calculated Volume 3" 0.37 other radius'-,0.163 <br /> Time Temp (°F) pH Cond. Turbidity Gals. Removed Observations <br /> C Z (03• 7 1 SOY 7 loop y',I/ <br /> g CO (-o3• (o -77 W4 y Oo <br /> I <br /> Did well dewater? Yes o Gallons actually evacuated: <br /> Sampling Time: 9 '36 Sampling Date: <br /> Sample I.D.: W_ f Laboratory: S7G Ch•-oK4 <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: Sle 5e) , / <br /> Equipment Blank I.D.: @ Time Duplicate I.D.: <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: <br /> ).0. (if req'd): Pre-purge: mg/L Post-purge: m'/L <br /> ORP (if req'd): Pre-purge: mV Post-purge: mV <br /> laine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />