Laserfiche WebLink
v�ELL MONITORING DATA SHEET <br /> Project 4: Client: r. <br /> iainpler: ,�( Start Date: <br /> Well I.D.: _ Well Diameter( 3 4 6 8 <br /> Total Well Depth: ZG,g r7 Depth to Water: Z v <br /> Before: After: Before: After: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: PV Grade D.O. Meter (if req'd): YSI HACH <br /> Purge Method: Sanipling Method: Bailer <br /> Bailer Waterra Disposable Bailer,'— <br /> Disposable <br /> ailer✓Disposable Bailer--"' Peristaltic Extraction Port <br /> Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other: <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> / 1" 0.04 4" 0.65 <br /> (Gals.)X _ Gals. 2" 0.16 6" 1.47 <br /> 1 Case Volume Specified Volumes Calculated Volume 3^ 0.37 ower radius'-*0.163 <br /> Time Temp {°F) pH Cond. Turbidity Gals. Removed Observations <br /> e/.S 6715, 70 Uv 2 <br /> 7,4 <br /> 0 Z <br /> Did well de.water? Yes Gallons actually evacuated: <br /> Sampling Time: ,G S_ Sampling Date: Z <br /> Sample I.D.: �� Laboratory: �L <br /> Analyzed for: -G BTEX MT PH- Other: . <br /> Equipment Blank I.D.: @ Duplicate I.D.: <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: <br /> mg ni <br /> .O. (if req'd): Pre-purge: /L Post-purge: '/L <br /> ORP (if req'd): Pre-purge: MV Post-purge: MV <br /> R4aiimo Toro, (ZanI1CeS 4"r- I APO Rn"4mr¢ Q,q►c q-�r, Incfl 1A00\ <br />