My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010874
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
8181
>
3500 - Local Oversight Program
>
PR0544805
>
ARCHIVED REPORTS XR0010874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:07 AM
Creation date
9/4/2019 2:14:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010874
RECORD_ID
PR0544805
PE
3528
FACILITY_ID
FA0005204
FACILITY_NAME
GENSTAR WESTERNSTONE PRODUCTS
STREET_NUMBER
8181
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25014005
CURRENT_STATUS
02
SITE_LOCATION
8181 W ELEVENTH ST
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mow,. <br /> RY <br /> i <br /> Y. <br /> P <br /> I WatexWark <br /> Health and Safety Plan <br /> Underground Tank Investigation <br /> INTRODUCTION+ <br /> PURPOSE AND SCOPE <br /> The Health and Safety Plan, for underground tank investigations, <br /> provides for the protection of on-site personnel and the <br /> surrounding community during site characterization activities. <br /> The requirements, specifications and procedures presented with <br /> this plan will apply to all personnel on-site, including <br /> employees, sub-contractors, site visitors wind regulatory agency <br /> personnial. <br /> x _ <br /> > KEY PERSONNEL <br /> ` WaterWork 's Safety Coordinator/Protect Manager will provide <br /> training to site personnel in the use of safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> program. The Safety Coordinator/Project Manager will have the <br /> authority to deny access to any individual without the proper <br /> training or protective equipment required for the site conditions <br /> or those individuals disregarding site safety procedures. All <br /> i0 site personnel will be under the direction of the safety <br /> Coordinator/Prosect Manager. ' <br /> HAZARD ANALYSIS <br /> The property previously operated a gasoline and/or diesel fuel <br /> 'ow distribution facility. Historic data and evaluation of <br /> subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel contamination. <br /> The activities addressed by this safety plan include surface and <br /> subsurface soil and groundwater sample collection. These <br /> activities present the potential for exposure to toxic materials <br /> through both skin contact and inhalation. The subsurface <br /> sampling may also pose a fire and explosion hazard from gases and <br /> vapors trapped beneath the ground surface . <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.