Laserfiche WebLink
Our staff technician lecated tre two dome:'c wells on the site <br /> (Figure 1) but was not able to get any information on the screen <br /> intervals for these wells. Also, the staff at Western Stone was <br /> only able to give an approximate pumping rate of 50-60 gallons <br /> per minute for the wells. <br /> Section 2.9 <br /> The site is not connected to the municipal sewer service, as we <br /> originally thought, but has a septic tank. The location of the <br /> tank is shown on Figure 1, but the location of the leach lines <br /> are unknown at this time. <br /> WaterWork will, continue with the quarterly monitoring program. <br /> We expect to submit the next quarterly report by February of <br /> 1991. If you have any questions regarding this project, please <br /> contact either Lois Frantz or Bill Channell at your convenience. <br /> Respectfully, <br /> WaterWork <br /> Hill Channell <br /> Senior Geologist <br /> I ' <br /> Russell W. J'uncal <br /> Registered Geologist No. 3864 <br /> LF/tdp <br /> I <br />