i <br /> Geological Technics Inc. f <br /> Well Abandonment Report Page 4 <br /> Project No.750.2 <br /> January 12,2006 <br /> .s <br /> .4 <br /> horizontal lengths of 3-inch diameter PVC. These wells were abandoned using the following <br /> procedure: <br /> • The horizontal section of PVC pipe was exposed, by excavating a trench, as close to the <br /> sidewalk as possible using a backhoe. j <br /> • The horizontal sections were cut as close as possible to the sidewalk. <br /> r <br /> • Tremie pipe was run through the horizontal section of PVC to the 90° PVC elbow that linked <br /> horizontal and vertical casing. <br /> • Grout was pumped into each well casing through the '/4 inch diameter tremie pipe and was <br /> allowed to freefall into the vertical section. This procedure was repeated until the entire <br /> length of casing was filled. <br /> • Grout was pumped into the "cut" horizontal PVC and ahlowed to mushroom over the PVC <br /> and fill the bottom 12 to 18 inches of the trench. k <br /> • The excavated trench was backfilled to grade with clean overburden. , <br /> I <br /> Well: MW-3 <br /> This well was located in the narrow median along Es6lon Avenue. These wells were l <br /> abandoned using the following procedure: !� i <br /> • The well box and associated concrete apron were removed by jackhammer, carefully <br /> avoiding damaging the median. I <br /> • A vacuum truck and "wet" knife were used to excavate a hole to a depth of approximately I <br /> foot below grade. i <br /> • Grout was pumped into the well casing using,3/4 inch diameter tremie pipe while displaced <br /> water was pumped into a DOT approved steel drum until disposal was arranged. It was <br /> noted that very little displaced water was present. <br /> • Pressure of approximately 35 psi was applied to the well casing for approximately 5 minutes. <br /> • The well casing was then cut off approximately 8-inches below grade. <br /> • Grout was pumped into the "cut" well casing and allowed to mushroom over the casing to <br /> approximately 4-inches below the bricks used to pave the median. <br /> • The grout was allowed to dry overnight and GTI mobilized to the site the following day and <br /> cemented in new pavers to match the brickwork used in the median. <br /> t <br /> 3.0 SOIL DISPOSAL l <br /> d I <br /> ' I <br /> On January 12, 2006, Del-Tech Geotechnical Support Services transported 17,460 pounds of <br /> clean soil and concrete removed from the COE site during well abandonment activities. The soil I <br /> and concrete were transported to Munn & Perkins Reclamation, 26292 East River Road, <br /> Escalon, CA 95320 to be recycled. The scale ticket is included as Appendix C. <br /> ;i <br /> 4yF { <br /> :I I, <br /> �I 3 <br /> 1 <br /> T � <br /> I <br /> 'I <br /> 4 <br /> it <br /> ,L I� <br /> I F <br />