Laserfiche WebLink
Geolo kaI redmirs lxr. <br /> � Page 3 <br /> Site Closure Plan <br /> 4 Project No. 750.2 <br /> August 11,2005 <br />� I <br /> L concurred with SJCEHD's recommendations in a letter dated July 28, 2005. Both <br /> E correspondences are included in Appendix B. <br /> i <br /> In a letter dated August 3, 2005, SJCEHD requested a� work plan for destruction of all <br /> groundwater monitoring and remediation wells at the ii site. The following work plan <br /> addresses the destruction of all wells associated with the COE site. <br /> 2.0 WELL ABANDONMENT <br /> . i <br /> f <br /> There are five (5) water table, one (1) deep monitoring and four (4) vapor extraction wells <br /> associated with the COE site. GTI proposes properly decommissioning these wells in an <br /> effort to meet requirements leading to a "No Further Action Letter". All monitoring wells <br /> associated with the site have been monitored regularly' and are in good ,condition. No <br /> obstacles have been observed in any well. A summary of well construction:,Is included as <br /> Table 1 in Appendix A and well locations are denoted in Figure 2. <br /> A competent C-57 well driller (selected through bidding iprocess after workplan approval) <br /> will be employed to decommission the wells associated with the site. Permits will be secured <br /> as necessary and the local regulatory agency will be notified 48 hours prior to commencing <br /> work. <br /> i <br /> The wells will be divided into two categories: <br /> Category 1 Water table and deep monitoring wells'including: MW-1, MW-2, MW-3, <br /> MW-4,MW-5 and MW-101. <br /> * Category 2 Vapor extraction wells including: VEW-1, VEW-2, VEW-3 and VEW-4.. <br /> E <br />� Category 1 Wells: <br /> These wells will be filled with grout via a tremie pipe followed by pressurizing the grout <br /> filled wells. Approximately 35 psi of pressure will be applied to each well:for up to five i <br /> minutes. The pressure cap will be removed and the process will be repeated if there is more <br /> than three feet of headspace above the grout slurry.. <br /> The upper five feet of the borehole will then be drilled out using 8-inch hollow stem augers <br /> guided down the center of the well casing via a guide rod attachment on the drill bit. The <br /> upper five feet will be backfilled with clean material. The surface will be capped with the <br /> appropriate material (i.e. rock or asphalt) to match the surrounding surface conditions. <br /> r <br /> Special Conditions y <br /> MW-3 is located in the median along Escalon Avenue. Encroachment permits will need to <br /> be secured and both a north and a southbound lane will be closed during well abandonment <br /> L (approximately 3 hours). <br /> GTI proposes the following procedure to abandon MW-3:; <br /> Tim �h <br /> �� I <br />