Laserfiche WebLink
cook <br /> City off Escalon Page 2 <br /> Project No.: 750.2 <br /> March 29,2004 <br /> • Vapor monitoring was conducted monthly until the system was shut down <br /> • January 31, 2003 IC was shut down <br /> • On July 30, 2003 the IC was restarted to test the efficiency of the rebuilt IC unit <br /> • On July 30,2003 the IC was shut down awaiting permitting <br /> On December 9, 2003 the IC was restarted and a source test was conducted <br /> • On January 14 the IC was shut down due to mechanical issues <br /> • On Febntary 9, 2004, the San Joaquin Valley Air Pollution Control District informed Mr. <br /> Doug Stidham, City of Escalon,that the IC had failed the emission testing <br /> • The IC was removed from the property <br /> Proposed Direction of Project <br /> On February 20, 2004, GTI was directed to implement a modified vapor extraction treatment <br /> system at the site as outlined in the GTI Work Plan — Modified Vapor Extraction Treatment <br /> System (Granular Activated Carbon) dated February 12, 2004. Geological Technics Inc. <br /> proposes the following work be performed at the site: <br /> I. Obtain a new authority to construct permit <br /> 2. Bring in an electrical service for the new VES extraction equipment <br /> 3. Install the new vapor extraction system,to include: <br /> ❑ Vacuum blower with 200 scfm capacity <br /> ❑ Install two 2000-pound GAC units <br /> 4. Replace carbon as,needed (estimated monthly) <br /> 5. Prepare and submit technical reports <br /> 6. Perform groundwater monitoring: <br /> o Purge and sample the six (6) monitoring wells on a quarterly basis for three <br /> additional quarters. Previous budget includes groundwater monitoring up to the <br /> third quarter of 2004. This budget proposes sampling through the second quarter <br /> of 2005. <br /> o Submit the quarterly groundwater samples to Sherwood labs for: <br /> ■ BTEX,'TPH-G(EPA 8021B) <br /> ■ Fuel Oxygenates by EPA method 8260 <br /> Proposed Bidding of Project <br /> 1. We have found Sherwood Labs, Hilmar, CA to be both cost effective and currently in <br /> compliance with AB2886 mandated electronically deliverable format requirements. <br /> 2. GTI finds that Del-Tech is competitively priced and has the manifold and knockout drum in <br /> place. Changing contractors would cause delays and added expense. <br /> 3. We have found US Filters to be both cost effective and currently available to work in this <br /> area. <br /> These costs have been included in our budget-spreadsheet prepared`giving estimated casts for <br /> performing the work directed by SJC-EHD. The budget spreadsheet shows itemized costs for <br /> the tasks proposed in the attached action plan <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. <br />