My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2019 4:53:54 PM
Creation date
9/4/2019 4:27:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Of Escalon -2- July 2, 2001 <br /> Claim No. 013929 <br /> # Task* Amount Pre-Approved Comments <br /> 2 Remedial System Installation & $31,747 <br /> Startup <br /> 3 System operation has been reduced <br /> from 1 year to 3 months based on <br /> the isolated extent of <br /> Remedial System Operation& contamination and the levels of <br /> Maintenance - $15,000 contamination. Following 3 <br /> months of operation the <br /> effectiveness of remedation system <br /> will be re-evaluated. <br /> 4 Remedial System Monitoring & System monitoring has been <br /> GW Monitoring $13,544 reduced from 1 year to 3 months. <br /> 5 Soil Boring--Confirmation $6,305 <br /> 6 Data Analysis&Reporting $5,485 <br /> 7 Project supervision hours have <br /> been reduced from 40 hours to 20 <br /> Project Management $2,100 hours since the duration of the <br /> system monitoring has been <br /> reduced from 1 Zear to 3 months. <br /> TOTAL PRE-APPROVED $ 76,531 <br /> * Task descriptions are the same as those identified in Geological Technicss May 23,2001 cost estimate. <br /> • Only the tasks/costs reflected on the above table are pre-approved at this time. The Fund will <br /> review any tasks/costs that go beyond the pre-approved amount to be determined if the <br /> additional tasks and costs are necessary and reasonable. However, if costs exceed the above <br /> pre-approved amounts, the Fund will be unable to expedite your Reimbursement Request. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the Geological Technics proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract: the State of California <br /> cannot compel you to sign any specific contract. This letter pre-approves the costs as <br /> presented in the proposal dated May 23, 2001 by Geological Technics for conducting the <br /> work approved by the County for implementing the February 26, 2001, Geological Technics <br /> workplan. <br /> California En vrranmenla/Protection Agenev <br /> 0 Reefz/ed Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.