My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2019 4:53:54 PM
Creation date
9/4/2019 4:27:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fl <br /> 10/17/2000 09:56 209538585.2 GEOLOGICAL TECHNICS PAGE 01/01 <br /> �aw. <br /> F A X <br /> T 7t. A N S M IT T A L <br /> FROM: Ray Kablanow ;Geofggicaf Technics Inc. i <br /> DATE: 10/17/00 2741 River Road (office) <br /> Modesto, CA. 95351 <br /> TIME: 0930 <br /> Phone: 209/538-6424 <br /> #Pages: 1 (including this page) <br /> Fax: 209/538-5852 <br /> X Fax only <br /> Original to follow in mail <br /> a To: Logi Duncan Fax: 209-468-3433 <br /> Doug Stidhani Fax: 209 838-8045 <br /> Re: Pilot Study Report: Referenced Corrective Action Flan <br /> Location: Fortner,Arco Gas Mini /Mart, 1350 Escalon Ave,Escalon,CA. <br /> Lori <br /> With regards to theVapor Extraction Pilot Test Report dated!August 8, 2000, we referenced a <br /> Corrective Action Plan dated March 31, 1999. In-advertently this work plan was only developed <br /> as a draft and was not completed or submitted to you. Instead we changed it and developed a <br />! work plan for additional site characterization and for the vapor'extraction feasibility"Study. <br /> j <br /> By November 30, 2000, GTI will submit this plan as a guide for vapor extraction. Upon its <br /> approval, the City of Escalon can obtain approval of the costs to perform this work from the <br /> Fund. <br /> Thank you, <br /> Ray Kablanow <br />
The URL can be used to link to this page
Your browser does not support the video tag.