Laserfiche WebLink
-N State Vter Resources Control Board <br /> Division of Clean Water Programs <br /> 2014 T Street•Sacramento,California 95814•(936)227-4411 Gra Davis <br /> Winston H.Hickox Mailing Address: P.O.Box 944212•Sacramento.California•94244-2120 Y <br /> Secretaryfor FAX(916)227-4530"Internet Address: http:/IWWw.swreb.ca.govl cwphomuLusti ' j n P;' J2, 0 <br /> 7 <br /> Environmental tGovernor <br /> Protection <br /> J.D. Hightower JUN 7 6 C <br /> City Of Escalon <br /> P O Box 254 <br /> Escalon,CA 95320 <br /> UNDERGROUND STORAGE TANK CLEANUP FUND, CLAIM NO. 013929, FOR SITE ADDRESS: <br /> 1305 ESCALON AVE, ESCALON <br /> The State Water Resources Control Board(State Board) is able to issue,pursuant to applicable <br /> regulations,the enclosed Letter of Commitment(LOC) in an amount not to exceed $41,000. This LOC <br /> is based upon our review of the corrective action costs you reported to have incurred to date. The LOC <br /> may be modified by the State Board. <br /> It is very important that you read the terms and conditions listed in the enclosed LOC. Claims filed with <br /> the Underground Storage Tank Cleanup Fund far exceed the funding available and it is very important <br /> that you make use of the funding that has been committed to your cleanup in a timely manner. <br /> You are reminded that you must comply with all regulatory agency time schedules and requirements and <br /> you must obtain three bids for any required corrective action. Only corrective action costs required by <br /> the regulatory agency to protect human health, safety and the environment can be claimed for <br /> reimbursement. Unless waived in writing,you are required to obtain preapproval of costs for all <br /> future corrective action work(form enclosed). If you have any questions on obtaining preapproval of <br /> your costs or the three bid requirement,please call James Munch, our Technical Reviewer assigned to <br /> claims in your Region, at(916) 227-4430. Failure to obtain preapproval of your future costs may result <br /> in the costs not being reimbursed. <br /> The following documents needed to submit your reimbursement request are enclosed: <br /> • "Reimbursement Request Instructions" package. Retain this package for future <br /> reimbursement requests. These instructions must be followed when seeking reimbursement for <br /> corrective action costs incurred after January 1, 1988. Included in the instruction package are <br /> samples of completed reimbursement request forms and spreadsheets. <br /> • 'Bid Summary Sheet" to list information on bids received which must be completed and <br /> returned. <br /> • "Reimbursement Request" forms which you must use to request reimbursement of costs <br /> incurred. <br /> • "Spreadsheet" forms which you must use in conjunction with your reimbursement request. <br /> California Environmental Protection Agency <br /> C4 Recti•cled Paper <br />