Laserfiche WebLink
i <br /> t, <br /> Geological rechnia 1= Page 5 <br /> _ Groundwater Monitoring Report <br /> 1 Project No. 750.2 <br /> L November 18,2003 <br /> 1 <br /> • Vertical groundwater gradient was calculated for the event of September 6 2003 and <br /> was found to be insignificant. The magnitude of the vertical gradient has been getting <br /> progressively smaller during the last several monitoring events. <br /> • Oxidation-Reduction Potential measurements4 Table I <br /> ( ) are positive for all the wells. <br /> This suggests that the volume of contaminants leaching into groundwater has been <br /> stopped and that biodegradation of the contaminants is at a rate sufficient to mitigate the <br /> residual BTEX/TPH-G plume in the area around the source without depleting the <br /> oxygen. <br /> LThe dissolved oxygen measured at the site is between 3.98 and 4.82 ppm and is <br /> conducive to natural attenuation of BTEX/TPH-G. <br /> Recommendations: <br /> • Continue quarterly groundwater monitoring at the site. <br /> • Test for biodegradation indicators. <br /> • Perform vapor extraction for the proposed.6-month period and then consider the site for <br /> closure. <br /> 3.0 LIMITATIONS <br /> 3 This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered. It should be recognized that <br /> 1 definition and evaluation of environmental conditions is an inexact science and that the state <br /> or, practice of environmental geology/hydrology is changing and evolving and that <br /> standards existing at the present time may change as knowledge increases and the state of <br /> the practice continues to improve. Further, that differing subsurface soil characteristics <br /> i can be experienced within a small distance and therefore cannot be known in an absolute <br /> sense. All conclusions and recommendations are based on the available data and <br /> L information. <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law. No warranty, expressed or implied, <br /> is made. ^ <br />{ <br /> i <br />