My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010948
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0010948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 9:52:00 AM
Creation date
9/4/2019 4:54:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010948
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ceologcca17 echgtCs Ince <br /> 1101 7`h Street <br /> Modesto,California 95354 <br /> (209)522-4119/Fax(209)522-4227 <br /> REPORT <br /> v Interim Soil Investigation <br /> City of Escalon <br /> Former Arco Gas Mini Mart <br /> 1305 Escalon Ave. <br /> Escalon, CA <br /> .Project No. 750.2 <br /> October 2, 2003 <br /> 1.0 INTRODUCTION <br /> The site is located at 1305 Escalon Ave, Escalon, California in the Highway 120/McHenry <br /> n, Avenue Improvement Project. Figure 1 is a location map and Figure 2 is a site map. This <br /> property was previously an Arco Gas and Mini Mart. <br /> "`"'"'�,,,✓✓►' Previous work at this site includes two limited soil borings, soil sample analysis, and the <br /> removal of'the USTs and pump islands. During removal activities, soil samples were <br /> collected.which showed the presence of BTEX, TPH-G and MTBE. <br /> On February 12 & 23, 1999 Geological Technics Inc. (GTI) drilled six boreholes, collected <br /> soil and groundwater samples (including one groundwater sample from each borehole via <br /> l hydropunch methods) and tested these samples for petroleum hydrocarbons. Analytical <br /> results show the presence of BTEX, TPH-G and oxygenated fuel compounds in the soil and <br /> groundwater. <br /> From April of 1999 through January of 2000 three groundwater monitoring wells and four <br /> vapor extraction wells were installed on the site. Soil samples collected during the drilling <br /> of these wells show low to moderate levels of BTEX, TPH-G, MTBE and TBA in MW-1. <br /> Low levels of MTBE were detected in MW-2.. . Soil samples collected from VEW-1 showed <br /> low levels of Xylene and MTBE. <br /> On June 12, 2000, GTI and Del-Tech Geo Technical performed a vapor extraction pilot test <br /> at the site. Laboratory and field test results indicate the site is conducive to remediation by <br /> vapor extraction. <br /> ' On June 12, 2000, Ms. Lori Duncan of SJC PHS/EHD requested in writing that a work plan <br /> be prepared to define the lateral and vertical extent of the groundwater plume at the site. On <br /> li June 29, 2000, GTI prepared a work plan proposing the installation of two water table <br /> monitoring wells and one deep, discretely screened monitoring well. Ms Duncan.approved <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.