My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010950
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
3500 - Local Oversight Program
>
PR0544806
>
ARCHIVED REPORTS XR0010950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 9:56:00 AM
Creation date
9/4/2019 4:56:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010950
RECORD_ID
PR0544806
PE
3528
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
02
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />+ C <br /> L <br /> i <br /> qe0togical Technics lac. <br /> I 1101 7th Street <br /> u Modesto,California 95354 <br /> (209)522-4119(Fax(209)522-4227 <br /> i <br /> rr <br /> L REPORT <br />� Groundwater Monitoring L st <br /> 1 Quarter 2003 <br /> City of Escalon <br /> Former Arco Gas Mini Mart <br /> r 1305 Escalon Ave. <br /> L+: Escalon, CA <br />' Project No. 750.2 <br /> May 15, 2003 <br /> EXECUTIVE SUMMARY <br /> This report summarizes the 15f Quarter 2003 groundwater monitoring and sampling event that <br /> jtook place at the site on March 6, 2003. Thirteen monitoring events have been completed to <br /> date since the groundwater investigation was initiated in April 2000. All of the monitoring <br /> wells were non-detect for BTEX, TPH-G and the oxygenate compounds. The deep well <br /> MW-101 was non-detect for the eighth consecutive event. <br /> The. groundwater gradient for March 6, 2003, is 0.0012 ft/ft flowing N82°W. This is <br /> Lconsistent with past events (see Figure 2). Depth to groundwater at the site was slightly less <br /> then 63-feet below ground surface (bgs). <br /> i <br /> C; A vertical groundwater gradient calculation was made for the March 2003 groundwater- <br /> monitoring event. The vertical gradient was found to be in an upward direction with a slope <br /> that-is less than the water table horizontal gradient. <br /> The internal combustion engine (LC.) was set in operation on February 5, 2002. The IC ran <br /> r until February 27, 2002 when it was shutdown and removed from the site because it was not <br /> L properly controlling emissions. .The IC was completely rebuilt and returned to the site on <br /> April 22, 2002 and restarted. The IC operated until late May when it was again removed <br /> i <br />� C <br />
The URL can be used to link to this page
Your browser does not support the video tag.