Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> PA-1900055 <br /> ROBERT AND MYRNA TACSION/Error! Reference source not found. <br /> Use Permit No. PA-19000055 was approved by the Planning Commission on June 18, 2020. The <br /> effective date of approval is June 28, 2020. This approval will expire on December 28, 2021,which is <br /> eighteen (18) months from the effective date of approval, unless (1) all Conditions of Approval have <br /> been complied with, (2) all necessary building permits have been issued and remain in force, and (3) <br /> all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact: [209]468-3121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT". The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST"for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a 5,310 square-foot expansion of an existing 2,416-square- <br /> foot religious assembly. The expansion will include the construction of a 4,500-square-foot <br /> assembly area and an 810-square-foot breezeway to include three (3) offices, two (2) restrooms, <br /> and a copy room. The existing 1,320-square-foot assembly area will be converted to a fellowship <br /> hall. No commercial kitchen, day care facility, or school is proposed with this facility. (Use Type: <br /> Religious Assembly—Neighborhood) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1. All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with asphalt concrete or Portland cement concrete to provide a durable, dust free <br /> surface. (Development Title Section 9-1015.5[e]) <br /> 2. A minimum of fifty(50)total parking spaces shall be provided (0.33 spaces are required per seat) <br /> (Development Title Section 9-1015.3) <br /> 3. Each parking stall shall be an unobstructed rectangle, minimum nine (9) feet wide and twenty <br /> (20) feet long. (Development Title Section 9-1015.5[b]) <br /> 4. Compact parking spaces shall be a minimum seven and one-half(7 1/2)feet wide and sixteen <br /> (16) feet long, be individually designated as a compact space, and make up no more than <br /> twenty-five (25) percent of the required spaces. (Development Title Section 9-1015.5[c]) <br /> 5. All parking stalls and directional arrows must be delineated with paint. (Development Title Section <br /> 9-1015.5[d]) <br /> PA-1900055—Conditions of Approval 1 <br />