Laserfiche WebLink
PA-1900055 (UP), S00012249 Page 2 of 2 <br /> 11757 N. Davis Rd., Lodi June 24, 2019 <br /> local primacy agency (EHD) is prohibited without the concurrence of the Water Board. Please <br /> contact Michelle Frederick by email at michelle.fredericko-waterboards.ca.00v or by phone at <br /> (707) 576-2731 at the Water Board concerning the requirements for preliminary technical report <br /> submittal prior to issuance of building permits <br /> If the Water Board determines that an onsite well shall be used as the potable water source, a <br /> permit application to operate Small Public Water System shall be submitted to the EHD for <br /> approval prior to issuance of building permits. To issue a permit to operate, concurrence from the <br /> Water Board is required. A yearly permit to operate a public water system will be required by the <br /> EHD prior to sign off of the certificate of final occupancy (San Joaquin County Development Title, <br /> Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure, wholesome, and potable drinking water in accordance with San Joaquin County <br /> Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title 22, and Health and Safety <br /> Code, Section 116525 116570. <br /> Applicant may contact Robert McClellon, Program Coordinator, Small Public Water System <br /> Program, at (209) 468-0332 or rmcclellonosioov.org, for more information. <br /> E. Any geotechnical drilling shall be conducted under permit and inspection by The Environmental <br /> Health Department (San Joaquin County Development Title, Section 9-1115.3 and 9-1115.6) <br />