Laserfiche WebLink
U.S.Deportment or HamrWnd Security <br /> ITMA K14ical A <br /> I I"11 Brcodwiiy,SQc 120D <br /> Oiklmd.CA.94W-P-4052 <br /> Al <br /> & FEMA <br /> January 10,2019 <br /> Giuseppe Sanfilippo,Project Manager <br /> Community Development Department <br /> Development Services Division <br /> 1810 Ust Hazelton Avenue <br /> .Stockton,California 95205 <br /> Dear Mr.Sanfilippo: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA 1800316(UP)(APN!Address:213-0220-38,-4117300 West Delta Avenue,Tracy) <br /> (Supervisorial District 5). <br /> Please.review the current effective Flood Insurance Rate Maps(FIW\,4s)for the County of San <br /> Joaquin(Community Number 060299),Maps revised October 2Q,2.016 and City of Tracy <br /> (Community Number 060303),Maps revised October 16,2009. Please note that the City of <br /> Tracy,San Joaquin County,California is a participant in the National Flood Insurance Program <br /> (NFIP). The minimum,basic NI'-'IP floodplain management building requirements are described <br /> in Vol.44 Code of Federal Regulations i 4 C17R),Sections 59 through 65. <br /> A summary of these PIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain,(i.e.,Flood Zones A,AO,Ali,AE, <br /> and A I through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM,any development must not incru-isc base flood elevation levels. The term <br /> development means any innn-made change to improved or unimproved real estate, <br /> including but not limited to buildings,other structures,mining,dredging,filling, <br /> grading,paving,excavation or drilling operations,and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed pLz:qr to the stun of <br /> development,and must demonstrate that the developmentwould not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> w.w.m fann.pv <br /> Planning Commission Staff Report, Item # 1 02/06/2020 — PA-1800316 (UP) 22 <br /> Response Letters <br />