Laserfiche WebLink
a <br /> STANDARD REQUIREMENTS €if'r r <br /> SD-92-235 <br /> "PAGE THREE <br /> 5 ' <br /> 1 <x <br /> 2. The Encroachment Permit shall be required for work•within'.the <br /> road right-of-way (Development Title Section 9-1145.2) . <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of the <br /> building permit application for mobilehome . on permanent ' <br /> foundation or 15% at the time of renewal for a mobilehome on a <br /> temporary foundation. (The fee currently is $3, 002. 00 per <br /> single family dwelling unit in the Lodi. area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index asub <br /> p lashed by the Engineering News <br /> Record) (Resolution R-90-304, R-92-1025) . <br /> ------------------------------------------------------------------ -- <br /> NOTE: The permit will expire on December 31, 1995. Renewal will <br /> require a new application with a new fee. The new address for <br /> the second unit dwelling is 21751 N. Des Moines Road,, Acampo. <br /> s <br /> i <br />