My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002629 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DODDS
>
27398
>
2600 - Land Use Program
>
SA-99-88
>
SU0002629 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:21 AM
Creation date
9/4/2019 5:31:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002629
PE
2633
FACILITY_NAME
SA-99-88
STREET_NUMBER
27398
Direction
E
STREET_NAME
DODDS
STREET_TYPE
RD
City
ESCALON
APN
20121001
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
27398 E DODDS RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DODDS\27398\SA-99-88\SU0002629\SS STDY.PDF \MIGRATIONS\D\DODDS\27398\SA-99-88\SU0002629\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-1 <br /> Joe Da Silva Dairy Water Storage System Monthly Balance Chart <br /> New Was Chrt 1-p4-02.x1s <br /> Settling Ponds <br /> Animal units: 1,250 <br /> Settling Pond Capacity: 1,500,000 per pond <br /> Summer Settling Pond Storage: <br /> Winter Battling Pond Storage: <br /> 1st 2nd 3rd 4th Stir urni 1st 2nd <br /> Solids Collected 41,056 39,731 41,456 41,056 37,083 41,056 10,181 10,521 10,181d 10,521h 10,521h 10,181 <br /> Liquids Collected 164,223 158,925 164,223 164,223 148,330 164,223 177,252 183,161 177,252 183,161 183,161 177,252 <br /> Accumulation into pond 205,279 403,935 609,214 814,492 999,905 1,205,183 187,433 381,114 568,548 762,229 955,910 1,143,343 <br /> Data references: <br /> Reference"Dalry Facility Manure/Nutrient/Flush Production Chart". <br /> Settling ponds in use operate"full"as solids settle out and accumulate. <br /> Note-Settling pond use is alternated.Once one has become"loaded"with solids,the effluent is diverted to another pond. <br /> The loaded pond is then pumped dry,starting the composting cycle of the manure.Once the solids has composted,it will be spread on site as fertilizer or sold off site. <br /> Site use or off site sale is determined by correct agronomical application of nutrients to on site grasses and/or farm crops. <br /> �O <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.