My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002694 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DODDS
>
27815
>
2600 - Land Use Program
>
SA-99-19
>
SU0002694 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:25 AM
Creation date
9/4/2019 5:31:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002694
PE
2633
FACILITY_NAME
SA-99-19
STREET_NUMBER
27815
Direction
E
STREET_NAME
DODDS
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
27815 E DODDS RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DODDS\27815\SA-99-19\SU0002694\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
George teVelde Dairy Dairy Facility Manure/Nutrient Production Chart WASCHRTI.XLS <br /> Dodds Road <br /> Job#144 <br /> Manure Distribution: <br /> Summer&Winter-5%of lactating cow manure is deposited at parlors <br /> ref.1 (Total manure solids-5%)x 40%in corrals&scraped <br /> ref.2(Total manure effluent-5%)x 60%flushed from feed ail eys to settling ponds <br /> ref.3(Total manure Solids-5%)x 12.7%=solids x 40%in corrals less 20%carried back to flush by rainfall <br /> ref.4(Total manure effluent-5%)x 60%flushed from feed alleys plus 20%of manure solids carried back to flush alley by rainfall <br /> ref.5 Settling Ponds Summer&Winter <br /> Solids-Manure effluent(ref.2/ref.4)x 12.7%solids x 80%retention of solids. <br /> Liquids-volume solids 140%=liquids(60%) <br /> ref,6 Nutrient Lagoon Summer&Winter <br /> Solids-Manure effluent(ref.2/ref.4)x 12.7%=solids x 20%from settling pond <br /> Liquids-Total manure solids-5%(parlor)x 87.3%liquids retained In settling pond. <br /> Ref.7 Irrigation Pond Storage for parlor water that is fairly clean.This water is repyled to crop irrigation. <br /> Summer-Bam water gallons(ref."Milk Parlor Water-Summgr"work sheet)+5%of solids from lactating cows+parlor's roof rainwater runoff <br /> Winter-Barn water gallons(ref."Milk Parlor Water-Winter'work sheet)Note:no sprinkler washing of lactating cow at parlors in freezing weather.Estimated to be days.5 days each for the months Nov.Dec.Jan.and Feb <br /> Ref.8-Milk Paroirs effluent:Lactating cow and hospital pow milking parloF waters are diverted and depgsited dilectty to the irrigation pond It is estim4t9d that 6%of <br /> the total manure production from the lactating cows only,are relieved at the parlors and deposited directly to the irrigation pond.Manure from lactating cows:49,396 gals/day x 5%=2,495 gals/day <br /> Spec V1, B 3 Page 2 7/9199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.