Laserfiche WebLink
George teVelde Dairy Water Storage System Monthly Balance Chart WASCHRTI.XLS <br /> Dodds Road Settling Ponds <br /> Job#144 <br /> Animal Unite: 5,372 <br /> WastelDay 61,838 galsiday <br /> Settling Pond Capacity: 3,402,128 gallons each <br /> Summer Winter <br /> j 1st 2nd 3rd 4th 5th 6th/ 1st 2nd 3rd 4th 5th 6th <br /> Solids Collected 145,038 140,359 145,038 145,038 131,002 145,038 140,359 145,038 140,359 145,038 145,038 140,359 <br /> Liquids Collected 217,557 210,539 217,557 217,557. 196,503 217,557 210,539 217,557 210,539 217,557 217,557 210,539 <br /> Accumulation into pond 362,595 713,493 1,076,088 1,438,683 1,766,188 2,128,783 350,898 713,493 1,064,392 1,426,987 1,789,582 2,140,480 <br /> Total Collected., <br /> 1.Summer accounts for using sprinkler to wash cows at the milking parlor. <br /> There are two ponds.Only one at a time is being used to collect solids. <br /> Settling ponds will operate'full"of effluent. <br /> Note-Settling pond use alternated.Once one has become"loaded"with solids,the effluent is diverted to the other pond. <br /> The loaded pond is then pumped dry and unloaded.The solids are slacked and composted for on site fertilizer or off site sale. <br /> Site use or off site sale is determined by correct agranomical application of nutrients to on site grasses and/or farm crops. <br /> Sec VI, B 12 <br /> 1 Page 1 <br />