My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010313
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DRY CREEK
>
34443
>
2600 - Land Use Program
>
PA-1400209
>
SU0010313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:30 AM
Creation date
9/4/2019 5:34:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010313
PE
2622
FACILITY_NAME
PA-1400209
STREET_NUMBER
34443
Direction
N
STREET_NAME
DRY CREEK
STREET_TYPE
RD
City
GALT
APN
00902003 00906003 00907001
ENTERED_DATE
12/1/2014 12:00:00 AM
SITE_LOCATION
34443 N DRY CREEK RD
RECEIVED_DATE
12/1/2014 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DRY CREEK\34443\PA-1400209\SU0010313\APPL.PDF \MIGRATIONS\D\DRY CREEK\34443\PA-1400209\SU0010313\CDD OK.PDF \MIGRATIONS\D\DRY CREEK\34443\PA-1400209\SU0010313\EH COND.PDF \MIGRATIONS\D\DRY CREEK\34443\PA-1400209\SU0010313\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG , Inc . <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered(the bond <br /> should be valid for no longer than a 6 month period);or <br /> b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered,or <br /> C. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs first,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> C. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> ■ Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States[pursuant to Section 404 Clean Water Act], <br /> it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 <br /> days. It may be prudent to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed <br /> on the project site, the Corps and the Regional Water Quality Control Board (RWQCB) would have regulatory authority over those <br /> mapped areas[pursuant to Section 404 and 409 of the Clean Water Act respectively]and permits would be required from each of these <br /> resource agencies prior to grading the project site. <br /> If vnu have nnv rni iPctinnc nIPaSP rall (7nA� 7,i..r)_nRnn <br />
The URL can be used to link to this page
Your browser does not support the video tag.