Laserfiche WebLink
File No. 20-3445-(,- <br /> XLEI ` FELDER <br /> March 4 , 1991 <br /> opinion that the impact of the project on the underlying <br /> groundwater will be minimal . For your review we have attached a <br /> copy of the Septic Suitability Study performed for the adjacent <br /> Christian Covenant Church. <br /> ADDITIONAL SERVICES <br /> The review of plans and specifications, field observations, and <br /> testing by Kleinfelder, Inc. are an integral part of the <br /> conclusions and recommendations made in this report. If <br /> Kleinfelder, Inc. is not retained for these services, the client <br /> agrees to assume Kleinfelder, Inc. ' s responsibility for any <br /> potential claims that may arise during construction. The required <br /> tests, observations, and consultation by Kleinfelder, Inc. during <br /> construction includes, but is not necessarily limited to: <br /> 1 . Continuous observation and testing during <br /> site preparation and grading and placement <br /> of Engineered Fill . <br /> 2 . Observation of foundation excavations and <br /> drilling operations prior to placement of <br /> reinforcing steel . <br /> 3 . Consultation as required during <br /> construction. <br /> The above listed testing and observations would be additional <br /> services provided by our firm. The costs for these services are <br /> not included in our current fee arrangements. <br /> LIMITATIONS <br /> 1 . The conclusions and recommendations of this report <br /> are for design purposes for the proposed Crossroads <br /> Community Church project as described in the text of <br /> Copyright 1991 Kleinfelder, Inc. <br /> 8 <br />