Laserfiche WebLink
°Pa"TN COUNTY OF SAN JOAQUIN <br /> r' THOMAS R.FLINN <br /> a. DEPARTMENT OF PUBLIC WORKS DEPUTYNRCCTOR <br /> P. O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> r�id�si�`P 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> March 27, 1998 <br /> MAR r )J. <br /> TO: Thomas M. Gau, Senior Civil EngineerCT111I�1�� <br /> CommunityTDevelopment Department <br /> CONTACT PERSON: Jim Van Buren <br /> FROM: Gabriel Karam, Senior Civil Engineer G"K- <br /> Public Servicers Division <br /> SUBJECT: SA-98-4 A SITE APPROVAL APPLICATION FOR A PRIVATE RIGHT-OF-WAY <br /> TO PROVIDt ACCESS TO ANTIQUATED SUBDIVISION LOT 69 OF MOORLAND <br /> FARM SUBDIVISION, LOCATED ON A PRIVATE ROAD ON THE SOUTH SIDE OF <br /> EDWARDS ROAD, 1, 500 FEET WEST OF COMETA ROAD. (DISTRICT 5) . <br /> APPLICANT: Mario and Margie Parodi APN: 207-270--07 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area, <br /> Edwards Road has an existing right-of-way width of 60 feet and a planned <br /> right-of-way width of 60 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road <br /> right-of-way. 1 <br /> (Development Title Section 9-1145 .4) <br /> 2 . The access road from Edwards Road to the building site shall be <br /> improved in accordance with the requirements of the Uniform Fire Code <br /> Section 1.0 . 207, San Joaquin County Standards F-1a, F-1b and F-1c and <br /> the Ripon Fire District prior to issuance of the occupancy permit . <br /> (Development Title Section 9--1150 . 16 (b) (2) ) <br /> 3 . Proof of legal access across Lot 68 shall be provided. <br /> f <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development. Thelfee is due and payable at the time of building permit f <br /> application. (The fee currently is $1, 442 per single-family dwelling <br /> in the Escalon area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. ) <br /> (Resolutions R-90 304, R-91-1025, R-93-167, R-94-179, R--95-650 <br /> and R-96-592) <br /> GK:RH:ti <br /> PS-9C203.I1 <br /> E: Manuel Lopez, Deputy Director/Development <br />