— SEP-22-'92 TIDE: 08:i9M Y D J LIVAPCD SJZOi�E TEL N0,209 943-'7248 #1833 P03 <br /> ,j <br /> i <br /> Suggested Air duality Dust Mitigation Measures <br /> ffor construction Sites/ <br /> Pre-construction-Emissions generated during the pre,-construction process are of a concm to the <br /> District. The following dust control practices should be implemented: <br /> as All material excavated or graded should be sufficiently watered to prevent excessive amount <br /> of dust. Watering should occur at least twice a day with complete coverago, preftabiy in the <br /> late morning and after work is done for the day. <br /> s All clearing. grading. earth moving, or excavation activities should cease during periods of <br /> high wlnds greater than 20 mph average over one hour. <br /> yr All material transported off-site should be either sufficiently wa=ed or securely covered to <br /> prevent excessive amounts of dust. <br /> td The area disturbed by clearing, earth moving, or excavation activities should be minimized at <br /> all times. <br /> PD, The developer should mow, instead of disking, for weed control, thereby leaving the ground <br /> undistur ed and with a mulch covering. <br /> During Construction - After clearing, grading, earth moving, or excavation operadon4, during the <br /> construction phase. fugitive dust emissions should be controlled by the following methods: <br /> >P All inactive portions of the construction site should be seeded and watered until grass growth <br /> is evident. <br /> All active portions should be sufficiently watered to prevent excessive amounts of dust. <br /> Qerlersi rugitive Dust - At all times. fugitive dust emissions should be oontrolled Using the <br /> following procedures: <br /> s- -On-site vehicle speed should be limited to 15 mph. <br /> All area with vehicle traffic should be watered periodically or have petroleum-based <br /> palliatives' applied for Stabilization of dust emissions. <br /> s Streets adjacent to the project site sbould be swept at least once pec day to remove silt which <br /> may have accumul4W from construction activities. <br /> D ' Build a paved "apron" into project from ajoining paved roadways. <br /> Ozone Precursors-At all times. ozone precursor emissions should bo controlled by the following <br /> methods: <br /> i <br /> 0- All intarn,al combustion engines driven equipmea should bo properly maintained and well <br /> tuned according to manufacturer's speciftcations. <br /> of During the smog season (May through October), the conaruction period should be leagtbemed <br /> so as to minimize the number of vehicles and.equipment operating at the same time. <br /> SMAPl9 89642 <br /> f Use of petroleum-based palliatives shell meet the road oil requirements sof the DfsWct's Rule <br /> 409.6- Cutbsck Asphalt PBvinp Materiels. <br />