My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011163 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11751
>
2600 - Land Use Program
>
PA-1600220
>
SU0011163 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:59 AM
Creation date
9/4/2019 5:50:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0011163
PE
2625
FACILITY_NAME
PA-1600220
STREET_NUMBER
11751
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219-
APN
06908006
ENTERED_DATE
12/19/2016 12:00:00 AM
SITE_LOCATION
11751 W EIGHT MILE RD
RECEIVED_DATE
12/16/2016 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\11751\PA-1600220\SU0011163\SS_NL STUDY .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> SOIL SUITABILITY STUDY.............................................................................................1 <br /> Introduction.................................................................................................................1 <br /> ProposedDevelopment..............................................................................................1 <br /> SiteDescription...........................................................................................................1 <br /> ExistingSeptic System....................................... ............................................2 <br /> Proposed Septic System................................................................................2 <br /> On-Site Septic Permit History.........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................2 <br /> Septic Permit History in the Vicinity................................................................2 <br /> GroundWater Information .........................................................................................3 <br /> Depthand Gradient........................................................................................3 <br /> Potential Ground Water Contamination Issues..............................................3 <br /> On-Site Wells..................................................................................................3 <br /> WaterSample.................................................................................................4 <br /> Soil Profile and Geologic Information.......................................................................5 <br /> SoilBorings....................................................................................................6 <br /> Discussion of Soil Lithology............................................................................6 <br /> PercolationTest..........................................................................................................6 <br /> • Preparation and Presaturation of Percolation Test Holes..............................6 <br /> Percolation Test Procedure............................................................................7 <br /> PercolationTest Results ................................................................................7 <br /> Discussion of Percolation Test Results..........................................................7 <br /> Discussion of Septic System Sizing...............................................................8 <br /> NITRATELOADING STUDY...........................................................................................9 <br /> MassTransport Soil Properties.................................................................................9 <br /> Sourcesof Nitrate.....................................................................................................10 <br /> Contributionof Rainfall............................................................................................10 <br /> Quantity and Quality of Domestic Wastewater......................................................11 <br /> Estimated Flow and Concentration (Typical Use).................................. ...... 12 <br /> Estimated Flow and Concentration (Full Occupancy)................................... 13 <br /> Denitrification Reductions .......................................................................................14 <br /> NitrateLoading Estimate..........................................................................................15 <br /> Discussion of Nitrate Loading Results...................................................................17 <br /> Total NitrateImpact...................................................................................... 17 <br /> CONCLUSIONS AND RECOMMENDATIONS..............................................................18 <br /> LIMITATIONS.................................................................................................................19 <br /> SELECTEDREFERENCES...........................................................................................20 <br /> LOGE 1708 <br />
The URL can be used to link to this page
Your browser does not support the video tag.