My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002759
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2420
>
2600 - Land Use Program
>
SA-97-55
>
SU0002759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2019 12:12:32 PM
Creation date
9/4/2019 5:52:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002759
PE
2633
FACILITY_NAME
SA-97-55
STREET_NUMBER
2420
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
11/1/2001 12:00:00 AM
SITE_LOCATION
2420 E EIGHT MILE RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2420\SA-97-55\SU0002759\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> (6) Final slopes shall not exceed two feet horizontal to one foot vertical. <br /> Exception: Final slopes to a maximum of one and one-half feet horizontal to one <br /> foot vertical between terraces may be maintained when site-specific geologic and <br /> engineering analysis demonstrate through a slope stability analysis that the <br /> proposed final slopes will have,a minimum slope stability factor of safety as <br /> required above, while demonstrating suitability for the proposed end use and <br /> protecting against erosion(by means of revegetation or other methods approved <br /> by Development Services Division). <br /> Exception: Final fill slopes to a maximum of 1.1.feet horizontal to 1 foot vertical <br /> between 30-foot-wide terraces may be maintained on the north and west sides <br /> of Phase 2 adjacent to the southem and eastem sides of the plant (Phase 1). <br /> These compacted fill .slopes shall be overbuilt and then cut back to the final <br /> profile. Stockpiled material may be placed at the top of these slopes for <br /> purposes of surcharge. <br /> (7) All fill slopes shall be compacted to an average of 85 percent (with a minimum <br /> of 82 percent) of maximum density. Fill shall be placed in maximum three-foot- <br /> high I"ifts. During construction of fill slopes, fill material shall be keyed into the <br /> temporary cut slope so that it will not be placed on top of the sloped portion of <br /> temporary cuts. The method to create a fill slope shall be given an initial test by <br /> a geotechnical engineer to establish the percent of compaction. Submit <br /> additional random tests as required by Development Services Division. <br /> The geotechnical engineer for the above inspections shall be selected by San <br /> Joaquin County with the applicant being responsible for the cost of the <br /> professionalized services plus an administrative fee of 15 percent. <br /> (8) Establish survey monuments at each of the following locations and submit annual <br /> readings performed by a licensed land surveyor that will detect possible <br /> horizontal and/or vertical creep: <br /> (A) Phase 2: adjacent to both the east and south boundaries of Phase 1. <br /> (B) Phase 2: adjacent to the Califomia Aqueduct and Blewett Road. <br /> (C) Phase 3: adjacent to the Califomia Aqueduct, Bird Road, Lone Tree <br /> Creek, and the PG&E pipeline. <br /> (D) Phase 4: adjacent to the Califomia Aqueduct, Blewett Road, and Lone <br /> Tree Creek. <br /> i <br /> (E) Phase 5: adjacent to State Highway 132, Bird Road, the Califamia <br /> Aqueduct, and Lorre Tree Creek. <br /> I <br /> (F) Phase 6: adjacent to Interstate 5, Blewed Road, and the Califomia <br /> Aqueduct. <br /> l <br /> (G) Phase 7: adjacent to Caldomia Aqueduct <br /> i <br /> i <br /> Conditions of Approval -4 - QX-91-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.