My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002759
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2420
>
2600 - Land Use Program
>
SA-97-55
>
SU0002759
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2019 12:12:32 PM
Creation date
9/4/2019 5:52:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002759
PE
2633
FACILITY_NAME
SA-97-55
STREET_NUMBER
2420
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
11/1/2001 12:00:00 AM
SITE_LOCATION
2420 E EIGHT MILE RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2420\SA-97-55\SU0002759\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For reference,that maximum mining elevation will result in the following approximate initial <br /> maximum mining depths: <br /> (A) Phases Z 3, 4, and 8: .158 feet. <br /> (B) : Phase 5: Variable from 105 feet in the northeast to 145 feet in the southwest <br /> (C) Phases 6 and 7: Variable from 112 feet in the northeast comer of both phases <br /> to 147 feet at the southwesterly boundary of Phase 6 and the westerly boundary <br /> of phase 7. <br /> j. The reclaimed land surface shall be no less than 12 feet above the high level of the water <br /> table. The final reclaimed upper five feet of material shall consist of the following: <br /> The entire top five feet of reclaimed soil shall have a texture that includes a clay content <br /> of at least 20 percent and no more than 50 percerrt, and a sand and gravel content of no <br /> more than 80 percent (Clay particles are less than 0.002 millimeter in diameter, and <br /> sand and gravel includes all particles greater than 0.05 millimeter in diameter.) <br /> The upper three feet of the reclaimed soil (consisting primarily of stockpiled topsoil that <br /> has been set aside) shall have an organic matter content of at least one percent. <br /> As reclamation begins, the available material shall'be evaluated by the applicant to <br /> engineer the best possible soil to optimize agricultural productivity. This engineering will <br /> be conducted in light of current technology, data, and the best demonstrated cultural <br /> practices in use at the time of reclamation. <br /> Submit soil sample analysis from an independent laboratory for two-foot and four-foot <br /> depths(five random sample locations per 100 acres)of reclaimed soil. The analysis snail <br /> show that a minimum of 85 percent of the soil samples meet the content specifications <br /> outlined above. In addition, the analysis shall include recommendations for fertilization <br /> to be applied prior to commencement of proposed agricultural activity. <br /> Except as otherwise required by the Conditions of Approval, the excavator may sell or <br /> otherwise dispose of overburden which is not required to be replaced for the reclamation <br /> on the pit floor or for the enhancement of the agricultural suitability of the property. <br /> Maintain a master map of the soils stockpiled for reclamation. All of the material retained . <br /> for reclamation,including topsoil, shall be identified as to location within the project site. <br /> For each location, maintain a record of the estimated quantity of material and an analysis <br /> of the soils composition. A sample of soil from each kr=ion will be set aside for later use <br /> in determining the optimum soil blend for the reclaimed area Highly structured soils shall <br /> not be mixed with the topsoil or days. Clay content soils shall be maintained separately <br /> from topsoil. The information collected on these soils shall be used to engineer the soil <br /> profile to meet the standards relative-to cfay conterrt, organic content, and structure. <br /> Submit to Development Services Division the method proposed for the protection of <br /> topsoil from erasion. <br /> k. All private roads involved in an excavation shall be maintained to control the creation of <br /> dust The first 100 feet of any private road on the property that intersects with a publicly <br /> maintained road shall be paved with asphalt concrete. Traffic-control and waming signs <br /> Conditions of Approval - 6 - QC-91-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.