My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002560
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
5565
>
2600 - Land Use Program
>
SA-00-60
>
SU0002560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2019 9:17:17 AM
Creation date
9/4/2019 5:58:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002560
PE
2633
FACILITY_NAME
SA-00-60
STREET_NUMBER
5565
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
ENTERED_DATE
10/29/2001 12:00:00 AM
SITE_LOCATION
5565 S EL DORADO ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\5565\SA-00-60\SU0002560\CERT OC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> Compliance Assistance Bulletin- December, 1994 <br /> Asbestos Synopsis <br /> Asbestos Dema1%tlon#R.enovatloR SIMM. ry=. ... ... <br /> Prior to any renovation or demolition of a facility <br /> Inspect: Conduct an asbestos inspection of the site before: <br /> ■ Any renovation in which 160 sq. ft. of building materials, or 260 linear feet of pipe insulation will be disturbed, or <br /> ■ Any demolition of a facility with or without asbestos-containing materials <br /> Notify: Submit an asbestos notification form for any regulated renovation or demolition, 10 working days before the activity. <br /> Fees: Fees must be paid to the District with the notification for all regulated renovations and demolitions. <br /> Demolition Release Form: Prior to any demolition, you must have completed a demolition release form. Upon its approval by the <br /> District this signed form may be used as proof (needed by the building official} of compliance with, or exemption from, the <br /> NESHAP notification requirements. <br /> Submit this form to the building department with your application for a demolition permit. <br /> Applicability <br /> Facilities subject to the NESHAP (regulated facilities) include all commercial buildings, apartments with more than 4 units, other <br /> structures and non-portable equipment. Single family dwellings may be exempt, but only on a case by case basis. <br /> Demolitions subject to the NE.FMP (regulated demolitions) are demolitions of facilities described above, whether or not asbestos <br /> is present. <br /> Regulated renovation applies to any activity in which 160 sq. ft. of regulated asbestos-containing building materials or 260 linear <br /> feet of asbestos-containing pipe insulation is disturbed at a regulated facility. <br /> Asbestos Niatl#(cat fin alad }r specxaon RQqu rr�ments ' <br /> Definitions: <br /> Facilities: Facilities subject to the rule include "all structures, installations, buildings and equipment, <br /> except for single family dwellings and apartments with four or fewer dwelling units.' <br /> Single family dwellings and apartments are also subject to the regulation if: <br /> ■There is more than one building at a site being renovated or demolished, or <br /> •The building had been used for, or is being removed for a commercial or public use, or <br /> is to be used as a training burn exercise. <br /> Demolition: In addition to the total destruction of a structure, demolitions include "the removal of any <br /> structural load-bearing member from a facility together with any related handling <br /> operations or the intentional burning of a building" (training burns conducted by a fire <br /> fighting agency). Also, the separation of a structure from its foundation prior to <br /> relocation is a demolition. <br /> Renovation: Altering a facility or one or more facility components in any way, including the stripping <br /> or removal of regulated asbestos-containing material iRACM) from a facility component. <br /> Renovations include all activities in which asbestos could be disturbed at a regulated <br /> facility, including the clean up and removal of debris from buildings which have burned. <br /> JM hacegajoanlasbstosl.syn <br />
The URL can be used to link to this page
Your browser does not support the video tag.