Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> TH MA DIRECTOR <br /> R. LIINN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O, BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ ' <br /> STOCKTON,CALIFORNIA 95201-18 10 DEPUTY DIRECTOR <br /> Cq �FOR ;P209/468-3000 STEVEN WINKLER <br /> FAX:2091468-2999 DEPUTY DIRECTOR <br /> it <br /> HENRY M. HIRATA <br /> DIRECTOR , <br /> October 12 , 1998 1� I <br /> ' =� Ilr�I <br /> MEMORANDUM OCT12199$ <br />} <br /> TO: Thomas M. Gau, Senior Civil Engineer �,mn 1 unity Develo me <br /> Community Development Department rItDBt, <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam, Senior Civil Engineer 6K I <br /> Public Services Division <br /> • I <br /> SUBJECT: SA-9$-51 A SITE APPROVAL APPLICATIQN FOR AN UNMANNED <br /> TELECOMMUNICATIONS EQUIPMENT FACILITY HUB (NO ANTENNAS OR <br /> TOWERS) , LOCATED ON THE EAST SIDE OF EL DORADO STREET, 200 FEET <br /> SOUTH OF MATHEWS ROAD, FRENCH CAMP. (DISTRICT 1) . <br /> I <br /> APPLICANT: MediaOne of Northern California, Inc. APN: 193-170-08 <br /> INFORMATION: <br /> The site is not currently located within a -Federal Flood Insurance <br /> iAdministration Designated Flood Hazard Area. <br /> El Dorado Street has an; existing right-of-way width of 100 feet- anal a <br /> planned right-of-way width of 110 feet. i <br /> e <br /> RECOMMENDATIONS : <br /> 1 . Encroachment permit shall :;be required for work within road, <br /> right-of-way. <br /> (Development Title Sections 9-1145 .4 and 9-1145 . 5) f <br /> 2 . The driveway approach shall be improved in accordance with the <br /> requirements of Sari Joaquin County Standards R-17 prior to- issuance <br /> of the occupancy permit . <br /> (Development Title Section 9-1145.5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building permit <br /> application. (The fee currently is $616 . 00 per 1, 000 gross square foot <br /> of building as manufacturing in the Stockton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index ash published by the Engineering News Record. ) <br /> (Resolutions R-90-304, R--9:1-10251 R-93-167, R-94-179 , R-95-650 and <br /> R-96-592) <br /> f <br /> F <br />