Laserfiche WebLink
A <br /> 5 Sufficient <br /> I = Insufficient `✓ — <br /> I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ® ❑ 6.1 Site map showing the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> ❑ 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br /> ❑ 6.3 Description of the date, time and protocol used to prepare the test hole, including depth and dimeole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). I'\-��g1 _0-r— nsio s <br /> ® ❑ 6.4 Description of the date,time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to water remaining in hole, etc.) <br /> ❑ 6.5 The test conformed to SJC Policy EHD 02-02 (correct depth,diameter,2"gravel,6"water refill, correct readings <br /> i recorded). <br /> ® ❑ 6.6 Complete Percolation Test Form(including readings)was provided with RENS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> ® ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ® ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7.0 CONCLUSION SECTION <br /> ® ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Michael F. Escotto Reviewed Date: <br /> t <br /> I <br /> M <br /> i <br /> I <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />